- gn Rf 0
UNITED STATES o,,
NUCLEAR REGULATORY COMMISSION
REGION 11 o
$
101 MARIETTA STREET, N.W.
k
'*
ATLANTA, GEORGI A 30303 s...../
Report No.:
50-160/79-1 Docket No. : 50-160 License No.
R-97 Licensee: Georgia Institute of Technology Facility Name: Georgia Tech Research Reactor Inspection at: Georgia Institute of Technology, Atlanta, Georgia Inspection conducted: January 8, 1979 Inspector:
R. W. Zavado ki Approved by:
b 3/i]/79 A.F.GTbson,C$ef Da'te Radiation Support Section Fuel Facility and Materials Safety Branch Inspection Summary Inspection on January 8, 1979 (Report No. 50-160/79-1)
Areas Inspected: Routine, unannounced inspection of previously identified items. Inspection areas included monthly source calibration for the cooling water gamma monitor, daily and weekly surveillance tests, releases of liquid effluents to the sanitary sewer system, annual report update, contamination control, calibration source for the gas flow proportional counter, and cali-bration records. The inspection involved 8 inspector hours ont,ite by one NRC inspector.
Results: Of the seven areas inspected, no apparent items of noncompliance or deviations were identified.
7903 21003G,
,
.
.
RII Rpt. No. 50-160/79-1-1-
,/
DETAILS I Prepared by: /,
2/o/n R. W. Zavadoskf, Radiation Specialist Date Radiation Support Section Fuel Facility and Materials Safety Branch Dates of Inspection:
anuary 8, 1979 Reviewed by:
2/u/n
)
A. F. Gibson, niief Date Radiation Support Section Fuel Facility and Materials Safety Branch 1.
Individuals Contacted
- M. V. Davis, Director, Nuclear Research Center
- R. M. Boyd, Radiation Safety Of ficer
- Denotes those attending exit interview January 8,1979.
In addition the inspector met with four technicians.
2.
Licensee Action on Previous Inspection Findings (Closed) Noncompliance (78-02-01) Monthly Source Calibrations for the Cooling Water Gamma Monitor.
The inspector verified that since August 1978, the Cooling Water Gamaa Monitor has been calibrated monthly. The inspector had no further questions on this item.
(Closed) Noncompliance (78-03-02-02) Daily and Weekly Surveillance Tests Required by Technical Specification Table 4.2.
The inspector verified that the tests required ny Table 4.2 were being performed with a radiation source as the signal input.
The inspector also noted changes to procedures 2002, " Weekly Precritical Startup Checklist", and 2003, " Daily Startup Checklist" which lists the channels to be tested.
The inspector had no further questions on this item.
(Closed) Noncomplaince (78-02-03) Release of Liquid Effluents to the Sanitary Sewer _in Excess of Technical Specification 3.4(a)(1).
The inspector vertried that since July 1978, liquid effluents have not exceeded 3 X 10 6 pCi/ml gross beta activity and noted that the limits are now in the liquid waste log book.
The inspector had no further questions on this ite..
.
.
.
RII Rpt. No. 50-160/79-1-2-(Closed) Noncompliance (78-02-04) Annual Report.
The inspector noted that the licensee supplemented the annual report by letter, dated October 23, 1978, to meet the requirements of Section 6.7a of the Technical Specifications. The inspector had no further questions on this item.
(Closed) Unresolved Item (78-02-05) Contamination Control.
The inspector reviewed the records of contamination surveys taken since August 1, 1978, and found them to be adequate.
The inspector noted that surveys were normally conducted daily.
The inspector also noted the exception taken in the licensees letter of October 5, 1976.
The letter allowed contamination control limits to be changed at the discretion of Radiological Safety Officer.
(Closed) Open Item (78-02-09) Calibration Source for Gas Flow Proportional Counter.
The inspector noted that the Gas Flow Propor-tional Counter has been recalibrated with a cobalt-60 source and found to be 18.67% efficient. The inspector had no further questions on this item.
(Closed) Open Item (78-02-10) Calibration Records.
The inspector reviewed form RS-14a (revised 9/78), entitled " Instrument Calibration Record" and noted that the licensee records the initial and final readings for all calibrations. The inspector had no further questions on this item.
3.
Unresolved Items No new unresolved items were identified during this inspection.
4.
Exit Interview At the conclusion of the inspection on January 8, 1979, the inspector met with management representatives (denoted in paragraph 1).
The inspector summarized the scope and findings of the inspection.