IR 05000133/1981006
| ML20033C796 | |
| Person / Time | |
|---|---|
| Site: | Humboldt Bay |
| Issue date: | 11/24/1981 |
| From: | Schuster M, Schwan C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20033C793 | List: |
| References | |
| 50-133-81-06, 50-133-81-6, NUDOCS 8112040265 | |
| Download: ML20033C796 (1) | |
Text
______
__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _.
.
.
The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790.
,
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region V Report flo. 50-133/81-06 (IE-V-473)
Docket flo. 50-133 License No. DRR-7 Safeguards Group Licensee:
Pacific Gas & Electric Company 77 Beale Street San Francisco. California 94106 Facility Name:
Humboldt Bay Power Plant Inspection at:
Reaional Office, Walnut Creek Inspection Conducted: October 23, 26, 27, and November D and 24, 1981 Date of Last Physical Security Inspection Visit: April 6-9, 1981 Type of Inspection:
Soecial Safdiuards
//hhf/
Inspectors:
'ap, C. A. Schwaii, Physical Protection Inspector Date Signed Date Signed Date Signed Approved by: m9 N/d
,, /av/s7 M.' O. Schuster, Chief, Physical Security Section Date Signed l
Inspection Summary:
Areas Inspected: Reporting requirements for physical security events.
The inspection involved 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> in-office by one NRC inspector.
Results: The licensee was found to be in noncompliance with NRC reporting requirements for physical security events. Failure to submit a written report within the five day reporting requirement (Severity Level VI).