IR 05000087/1979004
| ML19291C339 | |
| Person / Time | |
|---|---|
| Site: | 05000087 |
| Issue date: | 12/21/1979 |
| From: | Hind J, Schaper J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19291C338 | List: |
| References | |
| 50-087-79-04, 50-87-79-4, NUDOCS 8001240247 | |
| Download: ML19291C339 (1) | |
Text
.
.
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCLENT
REGION III
.
Report No. 50-87/79-04 Docket No. 50-87 License No. R-119 Safeguards Grp IIA Licensee: Westinghouse Electric Corporation Post Office Box 41 505 Shiloh Boulevard Zion, IL 60099 Facility Name: Westinghouse Nuclear Training Center Inspection At: Westinghouse Nuclear Training Center,- Zion, IL Inspection Conducted: November 19 and 20, 1979 Date of Last Inspection: May 9 and 10, 1979 Type of Inspection: Physical Security Inspector:
r.' cnap r
/# A/b 9
'
'
'
0.,
, f Q 'd, Chief
. Hin 12 J /
~
Approved by:
J.
'
'
'
Safeguards Branch Inspection Summary Areas Inspected: Unarmounced inspection of the licensee's security plan and its implementation relative to the protection of SNM, security orga-nization, access control, alarm systems, keys, locks and hardware, com-munications, surveillance, procedures, security program review, and pro-tection against radiological sabotage. The inspector alto reviewed the previously identified weakness and item of concern. The inspection in-volved 9 on site hours by one NRC inspector.
Results: Of the 11 areas inspected, no items of noncompliance were iden-tified within the scope of the inspection.
.
1795 092 8 0 01240 M7
-
...
.
.
,