IR 05000087/1979002

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-087/79-02 on 790509-10.No Noncompliance Noted.Major Areas Inspected:Security Organization,Access Control,Alarm Sys,Surveillance & Sabotage Protection.Details Withheld (Ref 10CFR2.790)
ML19270H328
Person / Time
Site: 05000087
Issue date: 05/21/1979
From: Christoffer G, Hind J, Schaper J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19270H326 List:
References
50-0087-79-02, 50-87-79-2, NUDOCS 7906260209
Download: ML19270H328 (1)


Text

,

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-87/79-02 Docket No. 50-87 License No. R-199 Safeguards Group IIA Licensee: Westinghouse Electric Corporation Post Office Box 41 505 Shiloh Boulevard Zion, IL 60099 Facility Name: Nuclear Training Center Inspection At: Nuclear Training Reactor Site, Zion, Illinois

'ay 9-10, 1979 InspectionConduchd:

.t i

,

Inspectors:gG.M.Christofer f/ 21 l'7 9 p

(Dite)

b S[1-/ !"li

. F.

cha (date)'

h$

2/[7f Approved By: Cd. A. Hind, Chief

,5 Safeguards Branch (Date)

Insoection Sum =ary Inspection on May 9-10, 1979 (Report No. 50-87/79-02)

Areas Incpected: Routine, unannounced inspection of the licensee's security plan and its implementation relative to the protection of SNM; security organization; access control; alarm systems; keys, locks and hardware; communications; surveillance; procedures; security program review; and protection against radiological sabotage. Additionally, the inspectors reviewed the previously identified weaknesses and item of concern. The inspection involved 22 inspector-hours onsite by two NRC inspectors.

Results: Of the eleven areas inspected, no apparent items of noncompliance were identified within the scope of the inspection.

(Details: Part 2.790(d) Information)

2318 225 7906260209

.

-

_

..

.

.

, _

.

.

-. -