IR 05000073/1986001
| ML20211F734 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos Nuclear Center |
| Issue date: | 10/20/1986 |
| From: | Schuster M, Wieder A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML19292G161 | List: |
| References | |
| 50-073-86-01, 50-073-86-02, 50-73-86-1, 50-73-86-2, NUDOCS 8610310244 | |
| Download: ML20211F734 (1) | |
Text
{{#Wiki_filter:. .. _ _ ,. A.
i ' , .
- ~
' gTmli TRA"tMED ISECT11 CMTAlBS , 2.JM HJ0nW103 The information on this_page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790.
, U. S. NUCLEAR REGULATORY COMMISSION
REGION V
Report No. 50-073/86-01/86-02 (IE-V-775) Docket No. 50-073 License No. R-33 Licensee: General Electric Company P. O. Box 460 Pleasanton, California 94556 Facility Name: Nuclear Test Reactor (NTR) Vallecitos Nuclear Center Inspection at: Pleasanton, California Inspection Conducted: September 24, 25 and October 9, 1986 Date of Last Physical Security Inspection: April 8-9, 1984 Date of Last Material Control and Accounting Inspection: January 12-13, 1984 Type of Inspection: Routine unannounced material control and accounting, safeguards Inspector: /A. V. Wieder, Safeguards Auditor Date Signed , Approved by: /)?) O k/a3[ M!?M[/ l M. D. Schuster, Chief Date Signed
E Safeguards Section t- , I Inspection Summary: Areas Inspected: Material control and accounting for reactors, and followup ' on previously identified open items.
During this inspection modules 85102 a.nd ' 92701 were used.
. Results: ~There were no violations of NRC requirements in the two areas ~ examined during this inspection.
,,. ~ n i n v; r" " '" "'E '_ }Template:BrQ (J30