IR 05000072/1980001

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-072/80-01 & 50-407/80-01 on 800125.No Noncompliance Noted.Major Areas Inspected:Review of Security Plan,Protection of Snm,Security Orgainzation & Access Control.Details Withheld (Ref 10CFR2.790)
ML19296C750
Person / Time
Site: 05000072, University of Utah
Issue date: 02/08/1980
From: Evans C, Madson G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19296C744 List:
References
50-072-80-01, 50-407-80-01, 50-407-80-1, 50-72-80-1, NUDOCS 8002280087
Download: ML19296C750 (1)


Text

(s

.

s U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION IV

Report Nos. 50-72/80-01 50-407/80-01 Docket Nos 50-72 License No. R-25 50-407 R-126 Licensee: University of Utah Department of Nuclear Engineering Salt Lake City, Utah 84112 Facility Name: AGN-201M Reactor and Triga Reactor Inspection At: Salt Lake City, Utah Inspection Conducted:

January 17, 1980 Date of Last Physical Security Inspection Visit: January 25, 1978 Type of Inspection:

Unannounced Physical Security Inspectors:

[/

MI

h-C. Abigail Evans, Security / Investigation Specialist Ilate '

Approved By:

W N

G. I. Madsen, Chief, Reactor Operations and Date Nuclear Siipport Branch Inspection Summary Areas Inspected:

Included review of Security Plan; Protection of SNM; Security Organization; Access Control; Alarm Systems; Keys, Locks and Combinations; Communications; Surveillance; Physical Protection Procedures; Security Program Review and Protection Against Radiological Sabotage.

The inspection involved six inspector hours onsite by one NRC inspector.

The inspection was begun during a regular shift.

Results: The licensee was found to be in compliance with NRC requirements within the eleven areas examined during the inspection.

8002280 dFf