IR 05000072/1980001
| ML19296C750 | |
| Person / Time | |
|---|---|
| Site: | 05000072, University of Utah |
| Issue date: | 02/08/1980 |
| From: | Evans C, Madson G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML19296C744 | List: |
| References | |
| 50-072-80-01, 50-407-80-01, 50-407-80-1, 50-72-80-1, NUDOCS 8002280087 | |
| Download: ML19296C750 (1) | |
Text
(s
.
s U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION IV
Report Nos. 50-72/80-01 50-407/80-01 Docket Nos 50-72 License No. R-25 50-407 R-126 Licensee: University of Utah Department of Nuclear Engineering Salt Lake City, Utah 84112 Facility Name: AGN-201M Reactor and Triga Reactor Inspection At: Salt Lake City, Utah Inspection Conducted:
January 17, 1980 Date of Last Physical Security Inspection Visit: January 25, 1978 Type of Inspection:
Unannounced Physical Security Inspectors:
[/
MI
h-C. Abigail Evans, Security / Investigation Specialist Ilate '
Approved By:
W N
G. I. Madsen, Chief, Reactor Operations and Date Nuclear Siipport Branch Inspection Summary Areas Inspected:
Included review of Security Plan; Protection of SNM; Security Organization; Access Control; Alarm Systems; Keys, Locks and Combinations; Communications; Surveillance; Physical Protection Procedures; Security Program Review and Protection Against Radiological Sabotage.
The inspection involved six inspector hours onsite by one NRC inspector.
The inspection was begun during a regular shift.
Results: The licensee was found to be in compliance with NRC requirements within the eleven areas examined during the inspection.
8002280 dFf