IR 05000029/1986328

From kanterella
Jump to navigation Jump to search
Mgt Meeting Rept 50-029/86-328 on 861015.Major Items Discussed:Licensee Action Plan for Addressing Deficiencies Identified During 860611 Emergency Preparedness Exercise
ML20213F837
Person / Time
Site: Yankee Rowe
Issue date: 11/04/1986
From: Conklin C, Lazarus W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20213F812 List:
References
50-029-86-328-M, 50-29-86-328-M, NUDOCS 8611170205
Download: ML20213F837 (4)


Text

-_ . ._ . - -. .. _ - . - _ _ . - _ - . _ . . . - -- .

.

.

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report N /86- 328 Docket N j License No. DPR-3 Priority --

Category C

'

Licensee: Yankee Atomic Electric Company 1671 Worcester Road i ~

! Framingham, Massachusetts 01701 l

'. Facility Name: Yankee Nuclear Power Station I

Meeting At: NRC Region I, King of Prussia, PA Meeting Conducted: October 15, 1986 Inspectors: b- # 3 86 j C. Conklin, EP Specialist date Approved by: 2 476f 4< 4 f6

'

E date W.fre,Aazargg, Chief, Emergency paredness Section, EPRPB, DRSS

'

Meeting Summary

Licensee requested management meeting to discuss the Action Plan developed to
address the deficiencies identified during the Emergency Preparedness Exercise
of June 11, 1986. The licensee presented the results of their investigations

,

into the exercise deficiencies. Their discussion included corrective actions, i conclusions and proposed schedule.

!

!

!

I

<

!

,

! 8611170205 861107 PDR ADOCK 05000029

_~_ G _ _ _ _..._ _ P Q . , __ _ _ _ , _ , _ , , _ , , , _ _

.

.

.

DETAILS Licensee Attendees J. Robinson, Director, Environmental Engineering W. Riethle, Manager of Radiation Protection J. Kay, Technical Services Manager D. McDavitt, Lead Emergency Planner M. Lupien, Rowe Emergency Preparedness Coordinator NRC Attendees W. Lazarus, Chief, EPB, EPRPB, DRSS C. Conklin, EP Specialist, EPB, EPRPB, DRSS C. Gordon, EP Specialist, EPB, EPRPB, DRSS J. Schumacher, Senior EP Specialist, EPB, EPRPB, DRSS E. McCabe, Acting Chief, Projects Branch No. 3, DRP Background The NRC identified several deficiencies during the June 11, 1986, Emergency Preparedness Exercise at Yankee Nuclear Power Station. Two of those deficiencies, overall command and control, and protective action recommendations, were indicated as having the potential to degrade the licensee's ability to protect the health and safety of the public during an accident if not corrected in a timely fashio These deficiencies are discussed in detail in inspection report 50-029/86-0 . Discussion The licensee presented an Action Plan detailing the steps that are being taken to address the identified deficiencies. The details of this presentation are included as Enclosure 2. The NRC told the licensee that the actions being taken are adequate and timely, and that the overall direction of the Action Plan, as well as aggressive management involvement, should result in improvements to their emergency response capabilitie Attheconclusionofthemeeting,correctiveactions.the concerns regarding the licensee s NRC had Theno NRCfurther will questions or continue to follow the licensee's program for correction of deficiencies as part of the routine inspection progra _ ._ _ . . _ ___

.

  • '

Page 1 of 2

'

.

  • - Action Plan Emcrgency Plan Open Items NRC Scheduled Responso Coupletion Item N Open Item Revise OP-3330 and perform necessary 12/15/86 86-06-01 Self-reading pocket dosimeters (SRPD)/ dosimetry records for steps during 1987 Exercis CR/TSC need to be issued /kep Generate log book Completed 86-06-02 Official log books in CR, OSC, and EOF neede None require M/A 86-06-03 TSC (size and space).

Emphasized in the Radiation Protection Prior to 1987 86-06-04 TSC habitability (no high-range Coordinator's 1987 E-Plan Trainin Exercise dosimetry).

Redemonstrate in 1987 Exercis Excrcisc 86-06-05 TSC briefing Revise OP-3330 to incorporate criteri /15/86 86-06-06 No criteria for seiceting respiratory protection equipment establishe Purchasing ID badge /1/86 86-06-07 Identification badge OP-3344 to be revised and process being 1/15/87 86-06-08 Accountability process inefficien evaluate Exercise 86-06-09 Review the initial radio An evaluation into the initial radio and pre-transmission problem transuissions could not reconstruct any problems. This activity will be exercise monitored during the next exercise drills and pre-exercise drill .

.

. .

e Page 2 of 2 ,

.

.

Action Plan Emergency Plan Open Items FEC (Continued)

Scheduled Res ponse Completion Item N Open Item Needs procedure for EOF EOF activation procedure to be generated 12/5/86 86-06-10 activation, and E-Plan (Section 6) revise Command and contro E-Plan revision (Section 8) needed to 12/5/86 clarify responsibilities of key individual Protective action Revise OP-3304, OP-3310, and the E-Plan 12/5/86 recommendation (Section 10) to incorporate NRC guidanc Notification message to Vermont In addition to retraining of the TSC 1987 Exercise 86-08-01 inaccurat Coordinators on the importance of (Reoccur-ring Item) accurate notification messages, a discussion on this subject will be incorporated into the TSC Coordinator and EOF Coordinator's Lesson Plans for the 1987 Training.