IR 05000020/1982002

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-020/82-02 on 820927-28.No Noncompliance Noted.Major Areas Inspected:Implementation Status of Licensee Physical Security Plan & Review of General Requirements for Physical Protection of SNM
ML20028B391
Person / Time
Site: MIT Nuclear Research Reactor
Issue date: 11/03/1982
From: Gody A, Mckeown L, Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20028B384 List:
References
50-020-82-02, 50-20-82-2, NUDOCS 8211300343
Download: ML20028B391 (2)


Text

r

.

..

U. S. NUCLEAR REGULATORY COMMISSION

.,

,

REGION I

Report No. 5)-20/82-02 Docket No. 50-20 License No. R-37 Safeguards Group II Licensee: Massachusetts Institute of Technology 138 Albany Street Cambridge, Massachusetts 02139 Facility Name: MIT Nuclear Reactor Laboratory Inspection At: Cambridge, Massachusetts Inspection Conducted:

September 27 - 28, 1982 Date of Last Physical Protection Inspection: December 18 - 20, 1978 Routtne} Unannounced,PhysicalProtection Type of Inspectia

Inspectors:

A

/l-3 -R Lis

@cKeown,PhysicalProtectionInspector date ML n. s. n Gregor{ C. Smith, Physical Protection Inspector date Approved by:

MlE m

A. T. Gody, Chief, Safeg ds and Fuel date Facilities Section Inspection Summary: Routine, unannounced, physical protection inspection on September 27 - 28, 1982 (Report No. 50-20/82-02).

Areas Inspected: Implementation status of the licensee's recently approved physical security plan and a review of the General Requirements for the Physical Protection of Special Nuclear Material (SNM) of Moderate Strategic Significance.

The inspection involved 12 inspector-hours onsite by two NRC inspectors and was begun during regular hours.

Results: The licensee was in compliance with NRC requirements for the areas examined during this inspection.

.

O

6

e Report Details 1.

Key Persons Contacted Lincoln Clark, Jr., Director of Reactor Operations

John Bernard, Superintendent, MIT Research Reactor

Kwan Kwok, Assistant Superintendent, MIT Research Reactor

Paul Mondier, Shift Supervisor

  • Denotes those present at the exit interview.

2.

30703 - Exit Interview The inspectors met with licensee representatives (denoted in paragraph 1) at the conclusion of the inspection on September 28, 1982, and summarized the scope and findings of the inspection.

3.

92713 - Independent Inspection Effort No violations were noted.

The inspectors reviewed the physical security plan for the MIT Research Reactor Facility dated August 24, 1981, and correspondence relative to plan approval and implementation dates. The security plan was originally approved by the NRC on March 11, 1982, with an implementation date of

,

April 11, 1982.

Subsequent correspondence between the licensee and the NRC resulted in the compliance date being delayed until October 17, 1982.

The inspectors reviewed the implementation status of the new plan's hardware and administrative modifications.

The licensee stated the October 7, 1982, deadline would be met.

4.

81480 - General Requirements For Physical Protection of SNM of Moderate Strategic Significance No violations were noted.

The licensee's program for the physical protection of SNM of moderate strategic significance conformed to NRC requirements and licensee procedures.

Specific components of the program that were inspected included: records and reports; security organization; alarm response; key control; detection aids; physical barriers; and written security procedures.

.

-

--

.