IR 05000002/1980002
| ML19322E228 | |
| Person / Time | |
|---|---|
| Site: | University of Michigan |
| Issue date: | 03/04/1980 |
| From: | Davis A, Robert Davis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Kerr W MICHIGAN, UNIV. OF, ANN ARBOR, MI |
| Shared Package | |
| ML19322E229 | List: |
| References | |
| NUDOCS 8003260327 | |
| Download: ML19322E228 (1) | |
Text
,
'
TIC f* I8 G%
,fe f+,
NUCLEAR REGULATORY COMMISSIO'
,(
C o
REGloN lit
'f 799 ROOSEVELT ROAD Es i
"*,,
g oten ettvu. ittisOis sois7
.....
March 4, 1980 Docket No. 50-2 University of Michigan AITN:
Dr. William Kerr, Director Michigan Memorial - Phoenix Project Phoenix Memorial Laboratory Ann Arbor, Michigan 48105 Gentlemen:
This refers to our letter dated February 25, 1980, and the attached in-spection report numbered 50-002/80-01. This report should have been numbered 50-002/80-02.
Enclosed with this letter is a correctly numbered report page. Please replace the misnumbered page with the enclosed revised page. Thank you.
Sincerely,
&.
-
A. B. Davis, Chief Fuel Facility and Materials Safety Branch
Enclosure:
Revised Report Page Report No. 50-002/80-02
REGION III==
.
Report No. 50-002/80-02 Docket No.50-002 License No. R-28 Licensee: University of Michigan Michigan Memorial-Phoenix Project Ann Arbor, MI 48105 Facility Name: Ford Nuclear Reactor Inspection At:
Ford Nuclear Reactor Site Ann Arbor, MI Inspection Conducted: January 21-23, 1980 4..V W d u Inspectors:
D. E. Miller 2 -/ % 4
,
II. h c {
/
.
%k(n
.
A. Paul A
)
h Approved By:
W. L.) $'i' sher, Chief
.:2[J.//Pc, s
Fuel Facility Projects and
'
'
Radiation Support Section Inspection Summary:
Inspection on January 21-23, 1980 (Report No. 50-002/80-02)
Areas Inspected:
Routine, unannounced inspection of radiation protection and radioactive waste programs, including:
qualifications; aucits; faci-lities; training; procedures; instruments and equipment; exposure con-trol; surveys; effluent releases; records and reports of effluents; effluent control instrumentation; posting, labeling, and control; notifi-cation and reports; licensee action on previously identified enforcement items and commitments; and IE bulletins and circulars. The inspection involved 34 inspector-hours on site by two NRC inspectors.
Results:
No items of noncompliance or deviations were identified.
9003260 M