Hurricane Ike
Jump to navigation
Jump to search
12 September 2008
- See also: Hurricane
Scrams (0)
General
| Start date | Site | Title | |
|---|---|---|---|
| ML25324A308 | 20 November 2025 | 99902117 05000614 | Enclosure 1: PSAR Subsection 2.4.2, Floods |
| ML21139A344 | 19 May 2021 | Advanced Reactors GEIS Docs - the Deadliest, Costliest, and Most Intense United States Tropical Cyclones from 1851 to 2010 | |
| ML20100F635 | 8 April 2020 | Indian Point | Expert Team Final Report |
| ML19003A306 | 21 December 2018 | Turkey Point | To Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.2, Floods |
| NRC-2015-0292, Comment (1) of Christopher Carson Opposing Protection Against Extreme Wind Events and Missiles for Nuclear Power Plants | 28 August 2015 | South Texas | Comment (1) of Christopher Carson Opposing Protection Against Extreme Wind Events and Missiles for Nuclear Power Plants |
| ML15204A324 | 21 July 2015 | Waterford | Attachment 2 to WF3-CS-15-00010, Rev. 0, Document 51-9227040-000, Fukushima Flood Hazard Reevaluation Report, Pp. 3-62 Through 3-146 |
| PNP 2015-018, Areva, Inc., 51-9226987-000, Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report | 25 February 2015 | Palisades | Areva, Inc., 51-9226987-000, Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report |
| ML14304A699 | 1 July 2013 | Indian Point | Federal Register, Vol. 78, No. 126, Power Sector Carbon Pollution Standards, Part 1 of 2 |
| IR 05000313/2010003 | 5 August 2010 | Arkansas Nuclear | IR 05000313-10-003, 05000368-10-003 on 04/01/2010 - 06/30/2010 for Arkansas Nuclear One, Integrated Resident and Regional Report; Adverse Weather Protection, Refueling Activities, Radiological Hazard Assessment and Exposure Control, & Occup |
| JAFP-09-0117, Resubmitted 2008 Annual Radiological Environmental Operating Report for the Period of January 01, 2008 Through December 31, 2008 | 16 October 2009 | FitzPatrick | Resubmitted 2008 Annual Radiological Environmental Operating Report for the Period of January 01, 2008 Through December 31, 2008 |
| L-09-140, RTL A9.690E, 2008 Annual Radiological Environmental Operating Report, Enclosure 3 | 1 July 2009 | Beaver Valley | RTL A9.690E, 2008 Annual Radiological Environmental Operating Report, Enclosure 3 |
| JAFP-09-0055, Annual Radioactive Effluent Release Report, for the Period of January 1, 2008 Through December 31, 2008 | 30 April 2009 | FitzPatrick | Annual Radioactive Effluent Release Report, for the Period of January 1, 2008 Through December 31, 2008 |
| NOC-AE-09002421, 2008 Annual Environmental and Annual Radiological Environmental Operating Reports | 30 April 2009 | South Texas | 2008 Annual Environmental and Annual Radiological Environmental Operating Reports |
| ML091310066 | 30 April 2009 | South Texas | 2008 Annual Environmental and Annual Radiological Environmental Operating Reports |
| ML091200417 | 3 April 2009 | Beaver Valley | Radioactive Effluent Release Report and 2008 Annual Radiological Environmental Operating Report |
| IR 05000458/2008005 | 29 January 2009 | River Bend | Integrated Inspection Report 05000458/2008005; 07200049/2008001; 9/28/2008 - 12/31/2008 |
| IR 05000334/2008004 | 12 November 2008 | Beaver Valley | IR 05000334-08-004, IR 05000412-08-004, on 07/01/2008 - 09/30/2008, Beaver Valley Power Station, Units 1 & 2, Problem Identification and Resolution |
| IR 05000313/2008004 | 7 November 2008 | Arkansas Nuclear | IR 05000313-08-004 and 05000368-08-004, on 06/24/2008 - 09/23/2008,Arkansas Nuclear One, Units 1 and 2, Integrated Resident Report, Problem Identification and Resolution; Event Follow Up, and Other |
| IR 05000498/2008004 | 6 November 2008 | South Texas | IR 05000498-08-004 & 05000499-08-004 on 6/29-/2008 - 9/27/2008 for South Texas Project Electric Generating Station, Units 1 and 2 |
| IR 05000458/2008004 | 6 November 2008 | River Bend | IR 05000458-08-004; Energy Operations, Inc; 06/29/2008 - 09/27/2008; River Bend Station, NRC Integrated Inspection Report |
| IR 05000445/2008004 | 5 November 2008 | Comanche Peak | IR 05000445-08-004 & 05000446-08-004; on 06/23 - 09/21/2008; Comanche Peak Steam Electric Station, Units 1 and 2: Integrated Resident and Regional Report; Fire Protection, Operability Evaluations, Plant Modifications, and Other Activities |
| IR 05000250/2008004 | 30 October 2008 | Turkey Point | IR 05000250-08-004 and 05000251-08-004, on 7/1/2008 - 9/30/2008; Turkey Point Nuclear Power Plant, Units 3 and 4; Surveillance Testing |
| IR 05000335/2008004 | 30 October 2008 | Saint Lucie | IR 05000335-08-004 & 05000389-08-004; on 07/01/2008 - 09/30/2008; St. Lucie Nuclear Plant, Units 1 & 2; Fire Protection and Other Activities |
| IR 05000483/2008004 | 29 October 2008 | Callaway | IR 05000483-08-004, on 6/25/2008 - 9/24/2008; Callaway Plant, Integrated Resident and Regional Report; Operability Evaluations, and Identification and Resolution of Problems |
| ENS 44487 | 15 September 2008 12:00:00 | Beaver Valley | Loss of Emergency Sirens Due to Power Outages Caused by High Winds |
| Press Release-IV-08-036, NRC Monitoring Approach of Hurricane Ike | 12 September 2008 | South Texas Comanche Peak | Press Release-IV-08-036: NRC Monitoring Approach of Hurricane Ike |