HBL-93-041, Forwards License Amend Request 93-01 to License DPR-7, Revising TS VII.H.3, Semiannual Radioactive Effluent Release Rept Extending Reporting Period from Semiannually to Annually & Changing Rept Submission Date

From kanterella
(Redirected from HBL-93-041)
Jump to navigation Jump to search
Forwards License Amend Request 93-01 to License DPR-7, Revising TS VII.H.3, Semiannual Radioactive Effluent Release Rept Extending Reporting Period from Semiannually to Annually & Changing Rept Submission Date
ML20045H694
Person / Time
Site: Humboldt Bay
Issue date: 07/07/1993
From: Rueger G
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045H695 List:
References
HBL-93-041, HBL-93-41, NUDOCS 9307210137
Download: ML20045H694 (2)


Text

Pacific Gas and Electric Company 77 Beale SUeet. Rxrn 1451 Gregory M Flueger PO. Bo< 770000 Senior Vice Pieside.nt and San francisco, CA 94177 General Manager -

415/973-4684 fluclear Power Generati6n f ax 415/973-2313 July 7, 1993 PG&E Letter No. HBL-93-041 WM9 j

g U.S. Nuclear Regulatory Commission d

M ATTN:

Document Control Desk l

Washington, D.C.

20555-Re:

Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 License Amendment Request 93-01 Revision of Technical Specification VII.H.3 - Change Semiannual

%dioactive Effluent Release Report to Annual Radioactive Effluent Release Report Gentlemen:

Enclosed is an application for amendment to Facility Operating License No. DPR-7. The enclosed license amendment request (LAR) proposes to-i revise Technical Specification VII.H.3, " Semiannual Radioactive Effluent Release Report," extending the reporting period from semiannually to l

annually and changing the report submission date from 60 days after January 1 and July 1 of each year to before April 1 of each year. These changes implement a recent amendment to 10 CFR 50.36a noticed in the 1

Federal Register, Page 39358, Vol. 57, No. 169.

i Since the proposed change is not required to address any immediate

-i safety concerns, PG&E believes that the NRC review and approval of this LAR should be of low priority.

PG&E requests that the license amendment be made effective immediately upon issuance.

Sincerely, 3,v Gregory M. Rueger i

cc:

Edgar Bailey, DHS Larry Bell Bobby H. Faulkenberry Ann P. Hodgdon CPUC Humboldt Distribution Enclosure opl'I 6036S/85K/MWZ/2265

[

W p y' 190125

[%j 9307210137 930707 ADOCK 05000133

_hDR PDR b

f PG&E Letter No. HBL-93-041 July 7,.1993 i

bec:.JPDillon

_(333/A1073)

RDMcKenna-(HBPP)

RCParker (HBPP) a CJWarner (77B/3027)

MWZimmermann (333/A1060)'

6036S/85K-P

- i s

(

4

?

n b

i I

t *

.,,