HBL-85-030, Forwards Memo Rept,Flood Hydrology for Decommissioning of Humboldt Bay Power Plant Unit 3, in Response to Item 3 of 850214 Request for Addl Info Re Safstor Decommissioning of Facility

From kanterella
(Redirected from HBL-85-030)
Jump to navigation Jump to search
Forwards Memo Rept,Flood Hydrology for Decommissioning of Humboldt Bay Power Plant Unit 3, in Response to Item 3 of 850214 Request for Addl Info Re Safstor Decommissioning of Facility
ML20132B678
Person / Time
Site: Humboldt Bay
Issue date: 07/11/1985
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To: Zwolinski J
Office of Nuclear Reactor Regulation
Shared Package
ML20132B683 List:
References
HBL-85-030, HBL-85-30, NUDOCS 8507250019
Download: ML20132B678 (2)


Text

- - -

\\

\\

PACIFIC G-AS AND ELECTR,IC C O M PANY bbMM l

77 BEALE STREET. SAN FRANCISCO, CALIFORNI A 94106. (415)781 4211. TWX 910 372-6587 JAMES D. $HIFFER

.am% 2.5 -

July 11,1985 PGandE Letter No.: HB L-85-030 Mr. John A. Zwolinski, Chief Operating Reactors Branch #5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Re: Docket No. 50-133, OL-DPR-7 Huntoldt Bay Power Plant, Unit No. 3 Humboldt SAFSTOR Decommissioning - Additional Information

Dear Mr. Zwolinski:

NRC letters dated January 23 and February 14, 1985 requested additional b

information on SAFSTOR decommissioning of Hunboldt Unit 3.

PGandE provided partial responses on February 28, March 20, and April 3,1985 (WL-85-005, mL-85-009, and mL-85-014, respectively).

In particular, a partial response was provided in HBL-85-014 to Item 3 of the February 14 request.

Enclosed is a complete response to Item 3 of that reques t.

Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

Sincerely, J.

. Shi ffer Encl osure cc:

P. B. Erickson J. B. Martin Service List (Decommissioning)

J 9

cN 2.gj0 hp e

iw e

1k

_j

\\

PGandE Letter No.: HB L-85-030 ENCLOSURE t

[

l l

l l

l l

0400s/0034K

.,A