GO2-95-089, Actuation of EDG

From kanterella
(Redirected from GO2-95-089)
Jump to navigation Jump to search
Actuation of EDG
ML17291A782
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/05/1995
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17291A783 List:
References
GO2-95-089, GO2-95-89, NUDOCS 9505100253
Download: ML17291A782 (2)


Text

I. RIORITY CCELERATED RIDS PROCESSING)'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9505100253 DOC.DATE: 95/05/05 NOTARIZED: NO DOCKET g

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION PARRISH,J.V.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards LER 95-007 re actuation of EDG.

DISTRIBUTION CODE IE22T COPIES RECEIVED LTRj ENCL L SIZE' TITLE: 50.73/50.9 Licensee Event Report (LER), Incident; Rpt, etc.

NOTES RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DOPS/OECB NRR/DRCH/HICB NRR/DSSA/SPLB NRR/DSSA/SRXB RGN4 FILE 01 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

~

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME CLIFFORD,J gJQ.B FZ E CE1Q@W DE EELB NRR/DISP/PI PB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DSSA/S PS B/B RES/DSIR/EIB COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1,.

1 1

1 1

1 1

1 EXTERNAL: L ST LOBBY WARD NOAC MURPHY,G.A NRC PDR 1

1 1

1 1

1 LITCO BRYCE iJ H

2 2

NOAC POORE,W.

1 1

NUDOCS FULL TXT, 1

1 VOTE TO ALL"RIDS" RECIPIEYTS:

PLEASE HELP US TO REDUCE iVKSTE!COYTECTTHE DOC!:ifEYTCO4'TROL DESK. ROO!vf PI -37 (EAT 504-2083 ) TO EL!ifIi'AI E 5'OL'R iAifL F ROTI DISTRIBUTION. LIS1 S I:OR DOCL'XIEi'I'S3'Of'OY."I'L'ED!

FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED:

LTTR 27 ENCL 27

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 May 5, 1995 G02-95-089 Docket No. 50-397 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

NUCLEAR PLANT WNP-2, OPERATING LICENSE NPF-21 LICENSEE EVENT REPORT NO. 95-007-00 Transmitted herewith is voluntary Licensee Event Report No. 95-007-00 for the WNP-2 Plant relating to actuation of the emergency diesel generators.

This event is not reportable under 10CFR50.72 or 10CFR50.73 because these generators are not classified as engineered safety features at WNP-2.

However, this report is submitted voluntarily as requested by NUREG-1022.

Should you have any questions or desire additional information, please call me or D.A. Swank at (509) 377-4563.

Sincerely,

. Parrish (Mail Drop 1023)

Vice-President, Nuclear Operations JVP/CJF/jcs Enclosure CC:

LJ Callan, NRC-RIV KE Perkins, Jr., NRC-RIV, Walnut Creek Field OfBce NS Reynolds, Winston & Strawn NRC Sr. Resident Inspector (Mail Drop 927N, 2 Copies)

INPO Records Center - Atlanta, GA DL Williams, BPA (Mail Drop 399) 9505100253 950505 PDR ADDCK 05000397 S

PDR