PRIGRITY 1
ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)
ACCESSION NBR: 9502140388 DOC. DATE: 95/01/31 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.
Washington Public Power Supply System SCHWARZ,C.J.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET N
05000397
SUBJECT:
Monthly operating rept for Jan 1995 for WNP 2.W/950207 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED: LTR ENCL 2 SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL:
CB ILE CENTER~1 NRR/DOPS/OECB EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1 10 10 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RRAB NRR/DISP/PI PB RGN4 NOAC COPXES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NiOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE KVASTE!CONTACTTHE DOCUXIENTCONTROL DESK, ROOKI Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR BLAMEFROif DISTRIBUTIONLISTS FOR DOCL'MENTS YOU DON"I'EED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 20 ENCL 20
~, ~
...UYASHINGTONPUBLIC.POWER SUPPLY SYSTEM
- PO."'BaY968'~'3000 George Washington" %'aP ~ Rlcblan'd,'ashington*99352-096'8
~ (509) 372-5000.:
February 7, 1995 G02-95-028 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Dear Sirs:
Subject:
WASHINGTONNUCLEAR PROJECT NO. 2 MONTHLYOPERATING REPORT JANUARY.1995 Transmitted herewith is the Monthly Operating Report for the month of January, 1995 as
, required by our Technical Specifications 6.9.1.6.
Sincerely,
. Schwarz Operations Manager (MD 9270)
CJS:DGE CC:
NRC, MN BB-7602, Washington, DC NRC, Administrator, Region IV NRC, Resident Inspector (927N)
INPO ANILibrary UtilityData Institute BPA (399)
FPPPg cq 9502140388 950131 PDR ADOCK 05000397 R
)
~
J 4
8 A
f[
II 3
ir E
E r
~
~
i~
- g 4 ~ 'y E
OPERATING STATUS REPORT for WNP-2 Date:
February 1, 1995 2.
3.
4 5.
6.
7.
8.
9.
3323 1200.9 1120 1132 1086 N/A Docket:
50-397 Reporting Period:
JANUARY 1995 Outage + On-Line Hours:
744.0 UtilityContact:
David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):
Nameplate Rating (Gross MW,):
Design Electrical Rating (Net MW,):
Maximum Dependable Capacity (Gross MW,):
Maximum Dependable Capacity (Net MW, ):
Ifchanges occur above since!ast repo<, give reasons:
10.
Power to which restricted, ifany (Net MW,):
11.
Reasons for restrictions, ifany:
None 12.
Report Period Hours 13.
Hours Reactor Critical 14.
Rx Reserve Shutdown Hours 15.
Hours Generator On-Line 16.
Unit Reserve Shutdown Hours 17.
Gross Thermal Energy (MWH) 18.
Gross Electrical Energy (MwH) 19.
Net Electrical Energy (MwH) 20.
Unit Service Factor 21.
Unit AvailabilityFactor 22.
Unit Capacity Factor (MDC Net) 23.
Unit Capacity Factor (DER Net) 24.
Unit Forced Outage Rate 25.
Forced=-Outage Hours MONTH 744.0 744.0 0.0 744.0 0.0 2,459,049 856,070 824,748 100.0%
100.0%
102. 1%
99.0%
0.0%
0.0 YEAR 744.0 744.0 0.0 744.0 0.0 2,459,049 856,070 824,748 100.0%
100.0%
102. 1%
99.0%
0.0%
0.0 CUMULATIVE 88,832.2 63,444.6 340.4 61,311.6 381.7 181,721,889 61,209,570 58,649,882 69.0%
69.4%
60.5%
59.8%
11.5%
7,971.1 26.
Shutdowns scheduled over the next 6 months (type, date, duration):
Annual refueling (R-10), April 15, 1995, 42 days.
27.
Ifcurrently shutdown, estimated startup date:
N/A Note:
Cumulative Unit Capacity Factors (MDC &DER) are calculated with weighted averages.
~
~
I r
MW A,n 4
H P
K
AVERAGE DAILY UNIT POWER LEVEL P
REPORT PERIOD:
JANUARY 1995 DOCKET NO.:
50-397 UNIT:
WNP-2 DATE:
February 1, 1995 COMPLETED BY:
D. G. Embree TELEPHONE:
(509) 377-8448 DAY AVERAGE DAILYPOWER LEVEL (Net MWe)
AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15 1118 1118 1118 1118 1117 1115 1114
1117 1115'114 1113 1115 1101 1104 1116 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1114 1109 1106 1106 1000 1118 1118 1117 1110 1115 1102 1114 1114 1107 1092 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures willbe used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
<<(
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:
JANUARY 1995 DOCKET NO.:
50-397 UNIT NAME:
WNP-2 DATE:
February 1, 1995 COMPLETED BY:
D.G. Embree TELEPHONE:
(509) 3774448 No.
Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None SUKGVlARY:
The plant operated at full power during most all of the month, except for short downpower evolutions for periodic testing and minor maintenance.
TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Administration G - Operational Error H - Olher METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scran>
4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREG-0161 Exhibits F &H