GO2-94-287, Forwards Revs 18,19 & 20 to WPPSS-QA-004, Operational QA Program.... Revs 18 & 19 Reflect Mgt & Organizational Changes & Rev 20 Reflects Changes to Methods Used to Review Procurement Documents & Monitor Procurement Process

From kanterella
(Redirected from GO2-94-287)
Jump to navigation Jump to search
Forwards Revs 18,19 & 20 to WPPSS-QA-004, Operational QA Program.... Revs 18 & 19 Reflect Mgt & Organizational Changes & Rev 20 Reflects Changes to Methods Used to Review Procurement Documents & Monitor Procurement Process
ML17291A570
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/29/1994
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17291A572 List:
References
GO2-94-287, NUDOCS 9501050367
Download: ML17291A570 (4)


Text

PRIORITY ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9501050367 DOC.DATE: 94/12/29 NOTARIZED: NO DOCKET N

FACIL:50-397 WPPSS Nuclear Project,.Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION PARRISH,J.V.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Revs 18,19

& 20 to WPPSS-QA-004, "Operational QA Program...."

Revs 18

& 19 reflect mgt

& organizational changes

& Rev 20 reflect changes to methods used to review I

procurement documents

& monitor procurement process.

DISTRIBUTION CODE:

Q004D COPIES RECEIVED:LTR J ENCL SIZE:

TITLE: QA Topical Report,

Change, Amendment, or Corresp ndence (Docket/Utili R

NOTES:

RECIPIENT ID CODE/NAME CLIFFORD,J INTERNAL: ACRS DRS/RGN2 DRS/RGN4 NRR/DISP/IMS OC/LFDCB EXTERNAL: DMB/OSS NRC PDR COPIES LTTR ENCL 1

1 8

8 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME DRS/RGN1 DRS RGN3 GENTER 01~

~'DOTS/TQMB RGN4 FILE IHS COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 Y

D U

iXOTETO ALL"RIDS RECIPI EY'TS; PLLASE HELP US TO REDUCE iVKSTE> CONTAC'I"IIIE DOCI:ifEYTCONTROL DESK, ROOM PI-37 (EAT. 504- 083 ) TO ELthflYATEYOI.'R'iAifLFI<Oil DISTRI8 UTIOYLIS'I'S I'OR DOCI.'5 IEX'I'S 5'Of: DON"I'I,"I'.I)!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 22

WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352-0968

~ (509) 372-5000 December 29, 1994 G02-94-287 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NPF-21 REVISION 18, 19 AND 20 TO OPERATIONAL QUALITYASSURANCE PROGRAM DESCRIPTION (WPPSS-QA-004)

The Supply System, in accordance with 10 CFR 50.54 (a)(3), has made changes to the U.S.

Nuclear Regulatory Commission (NRC) approved topical report, "Operational Quality Assurance Program Description (WPPSS-QA-004)."

Revision 18 and 19 to the OQAPD were necessary to reflect management and organizational changes.

These revisions modify the reporting responsibilities as listed below:

REVISION 18 Engineering Directorate reporting to the Assistant Managing Director, Operations Regulatory Programs reporting to the Assistant Managing Director, Operations Industrial Safety and Occupational Health transferred to Human Resources Fitness for Duty transferred to Security Hazardous material responsibility transferred to Technical Services Fire Protection program transferred to Technical Services Fire Training transferred to Training Division General Services transferred to Projects Directorate Instrument Maintenance and Calibration transferred to Plant Maintenance Environmental Sciences transferred to the Corporate Chemist 9501050367 PDR ADOCK 05000397

,t

1 i

J i

1 I

1 L

0 0

Page 2 REVISION 18, 19 AND 20 TO OPERATIONS QUALITYASSURANCE PROGRAM DESCRIPTION (WPPSS-QA-004)

REVISION 19 (Changes included in Amendment No. 126 to the Facility Operating License issued June 28, 1994)

Quality Assurance Directorate reporting to the Assistant Managing Director, Operations Combining Plant Administration and Records Management Reassignment of functions in the Support Services'ealth Physics Department REVISION 20 Changes in the methods used by Procurement QA and Quality Assessments to review procurement documents and monitor the procurement process.

Vertical lines have been placed in the right-hand margin to identify text changes, additions and deletion s.

Should you have any questions or desire additional information regarding this matter, please call me or J.C. Gearhart, Director, Quality Assurance, at (509) 377-8368.

Sincerely,

. V. Parrish (Mail Dr 1023)

Assistant Managing Director, Operations PLL/ml Attachments cc:

LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office NS Reynolds - Winston & Strawn JW Clifford - NRC DL Williams - BPA/399 NRC Sr. Resident Inspector - 927N