P RI(3RIT'Y 1

ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9410130267 DOC.DATE: 94/09/30 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH,NAME AUTHOR AFFILIATION EMBREE,D.G.

Washington Public Power Supply System SMITH,G.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Sept 1994 for WNP Unit 2.w/941005 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR I

ENCL 2 SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT ID CODE/NAME PD4-2 PD EXTERNAL EG &G BRYCE iJ

~ H NRC PDR COPIES LTTR ENCL 1

1 10 10 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RRAB NRR/DORS/OEAB RGN4 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACI'THE DOCUMENTCONTROL DESK. ROOM Pl-37 (EXT. 504-2083 ) TO ELlihIINATEYOUR NAME FROihl DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON"I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Bax 96'8 ~ 3000 George Wasbtngton Way ~ Rtcbland, lPasbtngton 99352-0968

~ (509) 372-5000 October 5, 1994 G02-94-232 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sirs:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT SEPTEMBER 1994 i

Transmitted herewith is the Monthly Operating Report for the month of September, 1994 as required by our Technical Specifications 6.9.1.6.

Sincerely, G. Q-.Smith Operations Division Manager (MD 9270)

GOS:DGE CC:

NRC, MN BB-7602, Washington, DC NRC, Administrator, Region IV NRC, Resident Inspector (927N)

INPO ANILibrary UtilityData Institute BPA (399) 9410i30267 940'730 PDR ADOCK 05000397 PDR

OPERATING STATUS REPORT for WNP-2 Date:

October 1, 1994 2.

3.

4.

5.

6.

7.

9.

3323 1200.9 1120 1132 1086 N/A Docket:

50-397 Reporting Period:

SEPTEMBER 1994 Outage + On-Line Hours:

720.0 UtilityContact:

David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):

Nameplate Rating (Gross MW, ):

Design Electrical Rating (Net MW,):

Maximum Dependable Capacity (Gross MW,):

Maximum Dependable Capacity (Net MW, ):

Ifchanges occur above since last report, give reasons:

10.

11.

Power to which restricted, ifany (Net MW,):

, Reasons for restrictions, ifany:

None 12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy (MWH)

Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)

Unit Capacity Factor (DER Net)

Unit Forced Outage Rate Forced Outage Hours MONTH 720.0 720.0 0.0 720.0 0.0 2,388,583 821,520 789,576 100.0%

100.0%

101.0%

97.9%

0.0%

0.0 YEAR 6,551.0 4,381.4 0.0 4,291.6 0.0 13,189,404 4,501,940 4,294,007 65.5%

65.5%

60.4%

58.5%

2.0%

85.8 CUMULATIVE 85,879.2 60,491.6 340.4 58,358.6 381.7 171,950,710 57,814,150 55,379,392 68.0%

68.4%

59.1%

58.5%

12.0%

7,971.1 26.

Shutdowns scheduled over the next 6 months (type, date, duration):

None 27.

Ifcurrently shutdown, estimated startup date:

N/A Note:

Cumulative Unit Capacity Factors (MDC &DER) are calculated with weighted averages.

S,

~

AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD:

SEPTEMBER 1994 DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-397 WNP-2 October I, 1994 D. G. Embree (509) 377-8448 DAY AVERAGEDAILYPOWER LEVEL (Net MWe)

AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15 1089 1094 1094 1103 1104 1094 1095 1093 1094 1104 1104 1104 1101 1092 1098 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1097 1099 1098 1097 1095 1097 1103 1103 1070 1101 1100 1098 1098 1090 1092 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

r

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:

SEPTEMBER 1994 DOCKET NO.."

50-397 UNIT NAME:

WNP-2 DATE:

October 1, 1994 COMPLETED BY:

D.G. Embree TELEPHONE:

(509) 3774448 No.

Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None

SUMMARY

The plant operated at full power during most all of the month, except for minor downpower evolutions for periodic testing.

TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREG-0161 Exhibits F &H

F

,,1

\\

e I

[500] From:

HEATHER L.

TOWNSEND at

-SERVER23 9/30/94 1:16PM (2001 bytes:

29 ln)

To:

JOHN H. 'SQAILES at

-SERVER2 cc:

JOHN W.. DABNEY at

-SERVER2, MICHAEL R.

KELLER at

-SERVER2, TAMMY S.

LOVE, DONALD H.

MERHAR at

-SERVER2, CHRISTOPHER J.

SCHWARZ, EULES K.

WORTHEN at

-SERVER2, JOHN E.

WYRICK at

-SERVER2, JOSEPHINE J.

AMES at

-SERVER2, WINDY N.

FRANK at

-SERVER2, ANITA E.

POOLE at

-SERVER2, JOSEPH V.

PARRISH at

-SERVERl, TRACI M.

HARDY at

-SERVER1, LINDA M.

MAR at

-SERVER4, SHARON M.

GRUNST at

-SERVER2, MARK E.

REDDEMANN at

-SERVER5, BEVERLY A.

CADWELL at

-SERVERS, JOHN R.

SAMPSON at

-SERVER2, LUELLA R.

HAWKINS at

-SERVER2, WILLIAMH.

BARLEY at

-SERVER2, CARMEN M.

SAWYER at

-SERVER24, JOHN F.

PETERS at

-SERVER2, DONNA E.

MCCAULEY at

-SERVER1

Subject:

Delegation of Authority Message Contents eeeeeeeeeeeeeeeeeeeeeeeeeeeeE INTEROFFICE MEMORANDUM aeeeeeeeeeee-eeeeeeeeeeei'eeeY DATE:

September 29, 1994 TO:

FROM:

J.H. Swailes, WNP-2 Plant Manager (927M)

G.O. Smith, Operations Division Manager (9270)

SUBJECT:

DELEGATION OF AUTHORITY

REFERENCE:

During my absence on October 2-4,

1994, Mr. C.J.

Schwarz will act for the Operations Division Manager.

Mr. Schwarz will have full authority of the position with the exception of personnel and salary actions.

Should my scheduled return be delayed, this delegation'hall continue until my actual return.

hit "Original signed and filed"

I k,

~ly jP