GO2-94-209, Monthly Operating Rept for Aug 1994 for WNP-2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1994 for WNP-2
ML17291A377
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/31/1994
From: Embree D, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-94-209, NUDOCS 9409130244
Download: ML17291A377 (10)


Text

IL

~

P 8:IC3 R.IMY'ACCELERATEDRIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)

ACCESSION NBR:9409130244 DOC.DATE: 94/08/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILXATION EMBREE,D.G.

Washington Public Power Supply System SMITH,G.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Aug 1994 for WNP-2.W/940906 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS RR DORS/OEAB REG F1DE 01 EXTERNAL: EG&G BRYCE,J.H NRC PDR COPIES LTTR ENCL 1

1 10 10 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RRAB NRR/PMAS/XRCB-E RGN4 NOAC COPXES LTTR ENCL 1

1 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACTTlfE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELlb,flVATEYOUR VAMEPRO!Lf DISTRIBUTIONLISTS I'OR DOCL'ME.JTS YOU DON"I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

Sr WASHINGTONPUBLIC POWER SUPPLY SYSTEM P.O. Bec 968 ~ 3000 George Wasbfngton Way Rtcb!and, Wasbtngton 993524968

~ (509) 372-5000 September 6, 1994 G02-94-209 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sirs:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT AUGUST 1994 Transmitted herewith is the=Monthly Operating Report for the month of August, 1994 as required by our. Technical Specifications 6.9.1.6.

Sincerely, G.. Smith Operations Division Manager (MD 9270)

GOS:DGE CC:

NRC, MN BB-7602, Washington, DC NRC, Administrator, Region IV NRC, Resident Inspector (927N)

INPO ANILibrary UtilityData Institute,..

BPA (399) 9409'130244 940831 PDR ADOCK 05000397

.PDR

C 4

p

'i~) +

~

c I'

~

c s

g

~

OPERATING STATUS REPORT for WNP-2 Date:

September 1, 1994 2.

3.

4 5.

6.

7.

8.

9.

Docket:

50-397 Reporting Period:

AUGUST 1994 Outage + On-Line Hours:

744.0 UtilityContact:

David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):

Nameplate Rating (Gross MW, ):

Design Electrical Rating (Net MW,):

Maximum Dependable Capacity (Gross MW,):

Maximum Dependable Capacity (Net MW, ):

Ifchanges occur above since last report, give reasons:

10.

Power to which restricted, ifany (Net MW,):

11.

Reasons for restrictions, ifany:

None 12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

Report Period Hours Hours Reactor Critical'x Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)

Gross Electrical Energy (MWH)

Net Electrical Energy (MWH)

Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)

Unit Capacity Factor (DER Net)

Unit Forced Outage Rate Forced Outage Hours MONTH 744.0 744.0 0.0 744.0 0.0 2,401,349 823,450 791,331 100.0%

100.0%

97.9%

95.0%

0.0%

0.0 YEAR 5,831.0 3,661.4 0.0 3,571.6 0.0 10,800,821 3,680,420 3,504,431 61.3%

61.3%

55.3%

53+7%

2.3%

85.8 CUMULATIVE 85,159.2 59,771.6 340.4 57,638.6 381.7 169,562,127 56,992,630 54,589,816 67.7%

68. 1%

58.7%

58.1%

12. 1%

7,971.1 26.

Shutdowns scheduled over the next 6 months (type, date, duration):

27.

Ifcurrently shutdown, estimated startup date:

None N/A Note:

Cumulative Unit CaIIacity Factors (MDC &DER) are calculated with weighted averages.

4 41 T I 4 II 4

hl I

I 4

II 4

4 h

WT ~

h

~ h,,th444 4

~

T IN

'4

~

~

NI, 4

"h ! Tt,!I; 4

hi '(!I'.

AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD:

AUGUST 1994 DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-397 WNP-2 September 1, 1994 D. G. Embree (509) 377-8448 DAY AVERAGEDAILYPOWER LEVEL (Net MWe)

AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15 559 905 1054 1087 1056 1100 1099 1096 1102 1099 1095 1094 1022 1092 1097 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1096 1097 1101 1093 1099 1100 1098 1098 1099 1098 1096 981 1092 1092 1091 1086 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

E Ij i'

't 4 (

l I

l II C

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:

AUGUST 1994 DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-397 WNP-2

'eptember I, 1994 D.G. Embree (509) 377-8448 No.

Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None SU1VPMRY:

WNP-2 completed the annual refueling and maintenance outage (R-9) last month and was ramping up to full power at the beginning of the month.

The plant was operating at full power during most of the month.

TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Olher METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREG-0161 Exhibits F &H

'\\

J 1

}

J 1

4 J

I" a

"I 4

I.

4 III f

I II

(497]

From:

HEATHER L.

TOWNSEND at

-SERVER23 9/1/94 11:29AM (2038 bytes:

29 ln)

To:'OHN H.

SWAILES at -S~R2 ccc, JOHN W.

DABNEY at -SER~R2, MICHAEL R.

KELLER at -

RVER2, TAMMY S.
LOVE,

~

DONALD W.

MERHAR at

-SERVER2, CHRISTOPHER J.

SCHWARZ, EULES K.

WORTHEN at

-SERVER2, JOHN E.

WYRICK at

-SERVER2, JOSEPHINE J.

AMES at

-SERVER2, WINDY N.

FRANK at

-SERVER2, ANITA E.

POOLE at

-SERVER2, JOSEPH V.

PARRISH at

-SERVER1,'RACI M.

HARDY at

-SERVER1, LINDA M.

MAR at

-SERVER4, SHARON M.

GRUNST at

-SERVER2, MARK E.

REDDEMANN at

-SERVER5, BEVERLY A.

CADWELL at

-SERVERS, JOHN R.

SAMPSON at

-SERVER2, LUELLA R.

HAWKINS at

-SERVER2, WILLIAMH.

BARLEY at

-SERVER2, CARMEN M.

SAWYER at

-SERVER24, JOHN F.

PETERS at

-SERVER2, DONNA E.

MCCAULEY at

-SERVER1 bcc:

G.

O.

SMITH at

-SERVER2

Subject:

Delegation of Authority Message Contents eeeeeeeeeeeeeeeeeeeeeeeeeeeef INTEROFFICE MEMORANDUM aeeeeeeeeeeeeeeeeeeeeeeeeeeeY DATE:

TO:

'FROM:

September 1,

1994 J.H. Swailes, WNP-2 Plant Manager (927M) r G.O. Smith, Operations Division Manager (9270)

SUBJECT:

DELEGATION OF AUTHORITY

REFERENCE:

During my absence on September 2-5,

1994, Mr. C.J.

Schwarz will act for the Operations Division Manager.

Mr. Schwarz will have full authority of the position with the exception of personnel and salary actions.

Should my scheduled return be delayed, this delegation shall continue until my actual return.

hit "Original signed, and filed"