GO2-94-188, Monthly Operating Rept for Jul 1994 for WNP Unit 2
| ML17291A332 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/31/1994 |
| From: | Embree D, Galen Smith WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GO2-94-188, NUDOCS 9408190212 | |
| Download: ML17291A332 (8) | |
Text
PH.jtC)H.I Jl. V 1
ACCELERATED RIDS PROCESSING)
N
%. ~
REGULATORY INFORMATION DISTRXBUTION SYSTEM (RIDS)
ACCESSXON NBR:9408190212 DOC.DATE: 94/07/31 NOTARIZED:
NO DOCKET FACXL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.
Washington Public Power Supply System SMITH,G.O.
Washington Public Power Supply System RECXP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Jul 1994 for WNP Unit 2.W/940809 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR i ENCLj SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECXPXENT ID CODE/NAME PD4-2 PD XNTERNAL: ACRS NRR/DOR~S.
OEAB FILE 01 EXTERNAL EGGG BRYCE IJ
~ H NRC PDR COPIES LTTR ENCL 1
1 10 10 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/DSP/TPAB NRR/DRIL/RPEB RGN4 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROOM P 1-37 (EXT. 504-2083 ) TO ELIMINATEYOVR NAMEFROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON"I'EED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 20 ENCL 20
%'ASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bax96'8 ~ 3000George ~asbtngton Way ~ Rtcbland, Wasbtngton 993524968
~ (509)372-5000 August 9, 1994 G02-94-188 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Dear Sirs:
Subject:
NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT JULY 1994 Transmitted herewith is the Monthly Operating Report for the month of July, 1994 as required by our Technical Specifications 6.9.1.6.
Sincerely, G. O. Smith Operations Division Manager (MD 9270)
GOS:DGE CC:
NRC, MN BB-7602, Washington, DC NRC, Administrator, Region IV NRC, Resident Inspector (927N)
INPO ANILibrary UtilityData Institute BPA (399)
~ Atgg PQ
'P408i902i2 94073i PDR ADOt"K 05000397 PDR
~>pA
ll 0
.~
I t
~ a y ~
l I
I
't 1
l
OPERATING STATUS REPORT for WNP-2 Date:
August 1, 1994 2.
3.
4.
5.
6.
7.
8.
9.
3323 1200.9 1120 1132 1086 N/A Docket:
50-397 Reporting Period:
JULY 1994 Outage + On-Line Hours:
744.0 UtilityContact:
David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):
Nameplate Rating (Gross MW, ):
Design Electrical Rating (Net MW,):
Maximum Dependable Capacity (Gross MW,):
Maximum Dependable Capacity (Net MW, ):
Ifchanges occur above since last report, give reasons:
10, 11.
Power to which restricted, ifany (Net MW,):
Reasons for restrictions, ifany:
None 12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
~
22.
23.
24.
25.
Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)
Gross Electrical Energy (MWH)
Net Electrical Energy (MWH)
Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)
Unit Capacity Factor (DER Net)
Unit Forced Outage Rate Forced Outage Hours
. MONTH 744.0 148.2 0.0 58.4 0.0 68,528 10,560
'958 7.8%
7.8%
0.0%
0.0%
0.0%
0.0 YEAR 5,087.0 2,917.4 0.0 2,827.6 0.0 8,399,472 2,856,970 2,713,100 55.6%
55.6%
49.1%
47.6%
2.9%
85.8 CUMULATIVE 84,415.2 59,027.6 340.4 56,894.6 381.7 167,160,778 56,169,180 53,798,485 67.4%
67.9%
58.4%
57.8%
12.3%
7,971.1 26.
Shutdowns scheduled over the next 6 months (type, date, duration):
None 27.
Ifcurrently shutdown, estimated startup date:
N/A Note:
Cumulative Unit Capacity Factors (MDC 8c DER) are calculated with weighted averages.
'N r
'~d p
P ~
N t
1
~ '""'l l
~
~
AVERAGE DAILY UNIT PO%ER LEVEL REPORT PERIOD:
JULY 1994 DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-397 WNP-2 August 1, 1994 D. G. Embree (509) 377-8448 DAY AVERAGEDAILYPOWER LEVEL (Net MWe)
AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15
-15
-14
-15
-15
-15
-15
-14
-15
-14
-14
-13
-14
-14
-14
-13 16 17 19 20 21 22 23 24 25 26 27 28 29 30 31
-14
-14
-12
-14
-15
-15
-14
-15
-18
-18
-18
-25 83 122 174 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures willbe used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
C' V
~
~
~
II
.1
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD:
JULY 1994 DOCKET NO.:
50-397 UNIT NAME:
WNP-2 DATE:
August 1, 1994 COMPLETED BY:
D.G. Embree TELEPHONE:
(509) 377-8448 No.
Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 94W3 April 30 S
685.7 RC FUELXX Continuation from previous month.
Plant officiallyconcluded the annual outage (R-9) on July 30.
SUMMARY
WNP-2 completed the annual refueling and maintenance outage (R-9) and was ramping up to fullpower by the end of the month.
TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Administration G - Operational Error H - Olher METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREG-0161 Exhibits F &H