RO-2004/00056 October 14,2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk
~ashington, D.C. 20555-8004
Subject:
onthly Operating Report Grand Gulf Nuclear Station Docket No. 50416 License No. NPF-29 ith thL requirement f Techni Afication 5.6.4, Ente 3Y Operations, Inc. is providing the ~ o n t ~ l y Operating Report OR) for Grand Gulf This letter does not contain any corn if you have any questions or require additional information, lease contact this office.
Yours truly, a~achments:
- 1. Operating Status
- 2. Average Daily Po
- 3. Unit Shutdo~n a
cc:
(See Ned Page)
GNRO-2004100056 Page 2 of 2 cc:
NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U.S. Nuclear Regulatory Commission ATTN: Dr. Bruce S. Mallett (w/2)
Regional Administrator, Region IV 61 1 Ryan Plaza Drive, Suite 400 Arlington, TX 7601 1-4005 U.S. Nuclear Regulatory Commission ATTN: Mr. Nageswaran Kalyanam, NRWDLPM (w/2)
ATTN: ADDRESSEE ONLY ATTN: US. Postal Delivery Address Only Mail Stop OWFN/7D-I Washington, D.C. 20555-0001 Mr. D. E. Levanway (Wise Carter)
Mr. L. J. Smith (Wise Carter)
Mr. N. S. Reynolds Mr. H. L. Thomas 6040056 to GNRO-2004100056 DOCKET NO 50-416 DATE 1010112004 COMPLETED BY J. Charboneau TELEPHONE (601) 437-6797 OPERATING STATUS
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
- 24.
Unit Name: GGNS UNIT 1 Reporting Period: September. 2004 Licensed Them1 Power (MWt): 3898 MWT Nameplate Rating (Gross MWe): 1372.5 MWE Design Electrical Rating (Net MWe): 1250 MWE Maximum Dependable Capacity (Gross MWe): 1257 MWE Maximum Dependable Capacity (Net MWe):
1207 MWE If changes occur in Capacity Ratings (Item 3 through 7) Since Last Report. Give Reason: NIA Power Level To Which Restricted, If Any (Net MWe):
Reasons For Restrictions, If Any: N/A None Hours in Reporting Period Number of Hours Reactor was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate This Month 720 720.0 0
Yr to Date 6575 5891.48 n
720.0 0
2,805,017 957,723 920,17 1 100.0 100.0 105.9 102.2 0.0 5838.0 0
22,536,698 7,695,006 7,393,681 88.8 93.2 90.0 0.0 88.8 Cumulative*
174,879 151,257.1 0
147.454.4 540,178,413 177,789,007 170,635,346 85.6 85.6 85.7 80.0 4.7 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25.
- 26.
If Shut Down At End of Report Period. Estimated Date of Startup: N/A Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 0710 1/85
- Items 1 1 through 18 are cumulative results since initial electricity GO40056 to GNRO-2004100056 50-416 DOCIET NO DATE 1010 112004 COMPLETED BY J. Charboneau TELEPHONE (601) 437-6797 MONTH: September 2004 DAY k
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 AVERAGE DAILY POWER LEVEL (MWe-Net) 1280 1276 1275 1274 1273 1272 1274 1282 1278 1276 1278 1275 I274 1275 1274 1273 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1275 1280 1285 1283 1283 1281 1278 1278 1274 1278 128 1 1286 1285 1286 31 GO40056 to GNRO-2004/00056 No.
UNIT SHUTDOWNS AND POWER REDUCTIONS Date Type (1)
Duration Reason Method Of Licensee Event System Code Component Cause & Corrective Action To Prevent Hours (2)
Shutting Down Report #
(4)
Code ( 5 )
Recurrence (C&CA)
REPORT MONTH September 2004 1
2 3
4 5
F: Forced Reason:
Method:
Exhtbit G - Instructions for Preparation of Exhibit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1 -Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161)
C-Refbeling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training &
5-Reduced load F-Admmistrative G-Operational Error (Explain)
H-Other (Explain)
Licensing Examination 6-Other GO40056