The following report was received via email from the
California Radiologic Health Branch (
RHB),
The Mistras Group's radiography crew was working at a temporary job site (inside a tank) on Friday, August 30, 2024. During the first exposure for the day at 0845 [PDT], the radiographer extended the source assembly and then felt the crank mechanism spin freely, causing the inability to retract the source assembly into the shielded position (a critical component failure). Emergency procedures were implemented; both radiographers extended their controlled radiation area boundary and monitored the area while the radiation safety officer (RSO) was notified at 0852. Source recovery personnel from Mistras Group's Torrance Lab arrived at 1040 to evaluate the situation. A recovery plan was discussed and implemented by the recovery radiographer. He entered the tank, opened the crank assembly, and determined the drive cable was not inside the housing. He opened the exposure side of the crank assembly and saw the end of the drive cable. He was able to retract the source assembly drive cable until the source assembly latched and locked inside the exposure device. This was accomplished at 1105. The RSO made a telephone notification to RHB at 1801 to report the event, but it went to voice mail, so he left his name and phone number. However, the voice mail was not forwarded and the RSO did not follow-up the next week to determine if his voice mail was received. A 30-day written notification of the event, per 10 CFR 34.101 was sent to RHB and received on September 28, 2024. Radiation exposures did not exceed 5 mrem for any involved personnel."
California Report Number: 093024