Title | Invalid Specified System Actuation Caused All 4 Emergency Diesel Generators to Start |
Event Description | This report is a 60-day telephone notification in lieu of a written licensee event report being made under 10CFR50.73(a)(2)(iv)(A) and 10CFR50.73(a)(1). The event was an invalid actuation of all four Emergency Diesel Generators (EDGs). At the time of the event Unit 1 was at 100% power and Unit 2 was in a refueling outage with the core offloaded.
At 1517 EDT on 6/4/2011, breaker 212 on Vital Battery Board III was opened under a work order in preparation for breaker maintenance. The opening of this breaker started the 2A-A EDG by removing the control power to the 2A-A EDG emergency start relays. In addition, the loss of control power to 2A-A EDG remote control circuit actuated a relay in the common emergency start circuit, which caused the other three EDGs to start. The 2A-A EDG was declared inoperable until it's control power was restored approximately 30 minutes after starting, requiring an unplanned entry for Unit 1 into Technical Specification Limiting Condition for Operation 3.8.1.1 action b. The impact on EDG control power was not foreseen when planning the breaker maintenance, so it was not expected that any EDGs would start. Both trains of the Unit 1 and 2 EDGs received a complete train actuation, started and functioned successfully. The EDGs ran unloaded. Actual plant conditions did not exist that required an automatic start of the EDGs. Therefore, this actuation was invalid. The 4 EDGs were not loaded and were returned to normal stand-by alignment. The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Sequoyah Tennessee (NRC Region 2) | |
Reporting | |
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
Time - Person (Reporting Time:+734.18 h30.591 days <br />4.37 weeks <br />1.006 months <br />) | |
Opened: | Richard Agnew 09:28 Jul 5, 2011 |
NRC Officer: | John Shoemaker |
Last Updated: | Jul 5, 2011 |
47022 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 47022\u003C/a\u003E - \u003Ca href=\"/Sequoyah\" title=\"Sequoyah\"\u003ESequoyah\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EInvalid Specified System Actuation Caused All 4 Emergency Diesel Generators to Start\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 47022 - Sequoyah\n","link":"","lat":35.22651944444444,"lon":-85.09192777777778,"icon":"/w/images/c/ce/Tennessee_Valley_Authority_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 551302021-01-11T16:52:00011 January 2021 16:52:00
[Table view]10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephonic Notification for Invalid Containment Ventilation Isolation Actuation ENS 514512015-08-07T23:19:0007 August 2015 23:19:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephone Notification for an Invalid Containment Isolation Activation ENS 511172015-04-12T17:20:00012 April 2015 17:20:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephonic Notification for an Invalid Containment Isolation Activation. ENS 470222011-06-04T19:17:0004 June 2011 19:17:00 10 CFR 50.73(a)(1), Submit an LER Invalid Specified System Actuation Caused All 4 Emergency Diesel Generators to Start ENS 472492011-05-05T19:20:0005 May 2011 19:20:00 10 CFR 50.73(a)(1), Submit an LER Invalid Specified System Actuation ENS 465042010-11-14T10:09:00014 November 2010 10:09:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Turbine Driven Auxiliary Feedwater Pump ENS 450852009-04-09T05:15:0009 April 2009 05:15:00 10 CFR 50.73(a)(1), Submit an LER Optional 60-Day Telephone Report of an Invalid Start of All Four Emergency Diesel Generators 2021-01-11T16:52:00 | |