At 1208
CDT on April 13, 2018,
GGNS [Grand Gulf Nuclear Station] identified cracks in the
primary containment concrete
penetration [outer wall] around feed water line 'B'. There are no available dimensions for crack width or depth until further inspections are performed.
In accordance with NUREG 1022, Event Reporting Guidelines 10 CFR 50.72 and 10 CFR 50.73, Section 3.2.4, any event or condition that results in the condition of the nuclear power plant, including its principal safety barriers being seriously degraded, requires that when a principal safety barrier is declared inoperable the condition must be reported under 10 CFR 50.72 (b)(3)(ii).
The licensee has notified the NRC Resident Inspector.
- * * RETRACTION FROM GERRY ELLIS TO HOWIE CROUCH AT 2012 EDT ON 4/15/18 * * *
Grand Gulf Nuclear Station (GGNS) personnel performed an inspection of the wall around feed water line 'B'. This inspection included the protective coating in the identified area and a partial inspection of the underlying concrete. The inspection of the protective coating found a collection of non-linear anomalies, chipping, and flaking. The inspection found non-significant linear indications in the concrete.
Grand Gulf Nuclear Station determined that the collection of non-significant coating imperfections and non-significant indications in the concrete do not constitute serious degradation of primary containment. The indications do not adversely impact the operability, mission time, or safety-function (as described per Technical Specification 3.6.1.1, Primary Containment) of the containment structure. The as-found conditions have been entered into the GGNS corrective action program for final disposition.
The containment structure is operable, therefore, GGNS is retracting this event notification.
The licensee has notified the NRC Resident Inspector. Notified R4DO (Kellar).