ENS 52913
ENS Event | |
---|---|
07:00 Aug 12, 2017 | |
Title | Part 21 Report - Relay Mounting Plate Mounted Upside Down |
Event Description | Pursuant to 10 CFR 21, this is a non-emergency notification by Energy Northwest concerning a defect in General Electric (GE) Nuclear HMA124A2 relays received at Columbia Generation Station.
On August 12, 2017, Energy Northwest completed a 10 CFR 21 evaluation of a condition associated with GE Nuclear HMA124A2 relays supplied by GE Hitachi Nuclear Energy Americas, LLC, and intended for use at Columbia Generating Station. The evaluation was performed to determine the applications where the relays were approved for installation, and where they were installed in the plant, and to determine if the failure of the relays could result in a Substantial Safety Hazard as defined In 10 CFR 21.3. Two of the HMA124A2 relays received had back plates that were mounted upside down, causing the terminals to not match the standard configuration. Although the internal wiring to the physical stud locations was correct, the numbering scheme embossed on the back plate did not match the correct configuration. With the incorrectly mounted back plate, the internal coil of the energizing circuit could be wired to the incorrect portion of the control circuitry, which would not energize when required and could result in the failure of a safety function. This deviation presents a Substantial Safety Hazard as defined In 10 CFR 21.3, as these relays were approved for use in safety related applications; however, there was no actual risk to plant safety since this deviation was recognized and resolved by station craft prior to installation of the relays. This condition is reportable under 10 CFR 21.21(d)(1) as a defect as defined in 10 CFR 21.3. The defective HMA124A2 relays were installed in the plant in the correct configuration with post-maintenance testing performed to ensure operability of the relays. The remaining HMA124A2 relays were examined and no additional defects were identified. GE Hitachi has been notified of the condition. The licensee will notify the NRC Resident Inspector. |
Where | |
---|---|
Columbia Generating Station Washington (NRC Region 4) | |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+130.92 h5.455 days <br />0.779 weeks <br />0.179 months <br />) | |
Opened: | Don Gregoire 17:55 Aug 17, 2017 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Aug 17, 2017 |
52913 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 52913\u003C/a\u003E - \u003Ca href=\"/Columbia\" title=\"Columbia\"\u003EColumbia\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPart 21 Report - Relay Mounting Plate Mounted Upside Down\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 52913 - Columbia\n","link":"","lat":46.55068333333333,"lon":-119.488975,"icon":"/w/images/7/7c/Energy_Northwest_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 529132017-08-12T07:00:00012 August 2017 07:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Relay Mounting Plate Mounted Upside Down ENS 526152017-03-14T23:00:00014 March 2017 23:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Notification - Evaluation of a Deviation - Starter Contactor Failure 2017-08-12T07:00:00 | |