On December 09, 2016 at 1734 EST, U2 Train-A
NSCW [Nuclear Service Cooling Water] Transfer Pump #8 tripped during Return To Service Surveillance testing for Train-B
NSCW Transfer pump #7. Technical Spec 3.7.9 Condition E entered at 1734 with Required Actions to be in M3 [mode 3, Hot Standby] in
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> AND M4 [mode 4, Hot Shutdown] in
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. A unit shutdown was commenced at 2042 EST [as a conservative measure] to comply with
TS 3.7.9 Condition E.
At 1937, U2 B-train NSCW Transfer Pump #7 was declared operable and TS 3.7.9 Condition E was exited. The plant is currently raising power to 100%.
The licensee notified the NRC Resident Inspector.