14:02 Jul 27, 2015 | |
| Title | Planned Outage for Plant Computer Systems |
| Event Description | On July 27, 2015 at 0902 [CDT], [the site commenced] a planned outage of the Emergency Response Data System (ERDS) and Safety Parameter Display System (SPDS), referred to as 'plant computer'. The unavailability of ERDS and SPDS could significantly affect the site's ability to respond to an emergency if one were to occur. During this time, Operations will be utilizing the site's procedures 1C1.5 and 2C1.5, 'OPERATION WITHOUT COMPUTER', which requires additional operators for monitoring of equipment affected by the loss of the plant computer. Additionally, as this is a planned outage, the work week schedule has been modified to ensure limited interactions required by Operations during this time frame. The site expects ERDS and SPDS to be operational 1200 July 28, 2015.
This event is reportable under 10 CFR 50.72(b)(3)(xiii), Any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of Control Room indication, Emergency Notification System (ENS), or Offsite Notification System). The ENS and Offsite Notification System are not affected by this planned outage. The health and safety of the public are not impacted by this planned outage. The NRC Resident Inspector has been informed. |
| Where | |
|---|---|
| Prairie Island Minnesota (NRC Region 3) | |
| Reporting | |
| 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
| Time - Person (Reporting Time:+0.43 h0.0179 days <br />0.00256 weeks <br />5.89014e-4 months <br />) | |
| Opened: | Jeffrey Human 14:28 Jul 27, 2015 |
| NRC Officer: | Jeff Rotton |
| Last Updated: | Jul 27, 2015 |
| 51266 - NRC Website
Loading map... | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
Unit 2 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
WEEKMONTHYEARENS 568042023-10-19T16:10:00019 October 2023 16:10:00
[Table view]10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Seismic Monitoring Capability ENS 548032020-07-29T00:49:00029 July 2020 00:49:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Failed Radiation Detector ENS 537002018-10-28T05:00:00028 October 2018 05:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Seismic Monitoring Panel System Inoperable ENS 532862018-03-23T21:35:00023 March 2018 21:35:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability ENS 515282015-11-11T14:26:00011 November 2015 14:26:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Shield Building Vent Gas Radiation Monitor Out of Service for Planned Maintenance ENS 512662015-07-27T14:02:00027 July 2015 14:02:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Outage for Plant Computer Systems ENS 510132015-04-25T02:25:00025 April 2015 02:25:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability Due to Out-Of-Service Radiation Monitors ENS 509482015-04-02T17:30:0002 April 2015 17:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Seismic Monitor Not Available for Emergency Plan Assessment ENS 506722014-12-12T08:48:00012 December 2014 08:48:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Auxiliary Building Normal Ventilation Radiation Monitor Failed ENS 506522014-12-03T15:50:0003 December 2014 15:50:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Control Room Area Radiation Monitor Failed Low ENS 504872014-09-24T12:28:00024 September 2014 12:28:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Shield Building Vent Gas Radiation Monitor Out of Service for Planned Maintenance ENS 504462014-09-11T15:09:00011 September 2014 15:09:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Shield Building Vent Gas Radiation Monitor Out of Service for Planned Maintenance ENS 504242014-09-04T13:43:0004 September 2014 13:43:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness 1R-50 Shield Building High Range Vent Gas Radiation Monitor Out of Service for Planned Maintenance ENS 502662014-07-10T13:38:00010 July 2014 13:38:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness High Range Shield Building Vent Stack Gas Monitor Removed from Service for Maintenance ENS 500512014-04-23T15:00:00023 April 2014 15:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness 2R-22 Shield Building Vent Gas Radiation Monitor Removed from Service for Planned Maintenance ENS 500012014-04-04T19:53:0004 April 2014 19:53:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Seismic Monitor Declared Non-Functional Due to Spurious Alarm ENS 499432014-03-21T18:00:00021 March 2014 18:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Shield Building Vent Gas Rad Monitors Out of Service for Planned Maintenance ENS 498242014-02-12T17:13:00012 February 2014 17:13:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Circulating Water Discharge Monitor Out of Service ENS 498062014-02-07T12:20:0007 February 2014 12:20:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Shield Building Vent Gas Radiation Monitor Failure ENS 497992014-02-06T13:30:0006 February 2014 13:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Radiation Monitor Out of Service for Maintenance ENS 497452014-01-20T08:16:00020 January 2014 08:16:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Shield Building Gaseous Radiation Monitor ENS 495072013-11-06T06:58:0006 November 2013 06:58:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness R-21 Circulating Water Discharge Radiation Monitor Planned Outage ENS 492592013-08-09T15:00:0009 August 2013 15:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Radiation Monitor Out of Service ENS 486202012-12-21T13:30:00021 December 2012 13:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Response Data System (Erds) ENS 448282009-02-04T19:20:0004 February 2009 19:20:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Sirens Out of Service Due to Planned Maintenance ENS 441752008-04-29T12:50:00029 April 2008 12:50:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Tsc Ventillation During Scheduled Maintenance ENS 441572008-04-23T09:10:00023 April 2008 09:10:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Tsc Ventilation System Considered Non-Functional ENS 440712008-03-17T13:00:00017 March 2008 13:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Degraded Habitability Control ENS 440572008-03-12T19:30:00012 March 2008 19:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Long Term Habitability of Technical Support Center Under Accident Dose Analysis Exceeds Acceptance Criteria ENS 435152007-07-24T07:56:00024 July 2007 07:56:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Ventilation Inoperable ENS 422502006-01-11T13:43:00011 January 2006 13:43:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Modification to the Unit 2 Process Computer That Will Impact Erds and Spds ENS 421882005-12-05T15:00:0005 December 2005 15:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Plant Process Computer System (Ppcs) Will Be Taken Out of Service for Approximatley 2 Weeks. 2023-10-19T16:10:00 | |