ENS 50720
ENS Event | |
---|---|
04:55 Nov 16, 2014 | |
Title | Invalid Actuation of 1A Emergency Diesel Generator (Edg) |
Event Description | This 60-day telephone notification is being made under the reporting requirements specified by 10 CFR 50.73(a)(2)(iv)(A) and 10 CFR 50.73(a)(1) to describe an invalid actuation of the 1A EDG. The 1A EDG start resulted from a degraded component during the testing of the 1A Emergency Load Sequencer.
At 2355 [EST] on November 15, 2014, the 1A EDG auto started during performance of the monthly 1A Emergency Load Sequencer test. The test was terminated by personnel prior to a full actuation of the Emergency Load Sequencer due to the unexpected response of the sequencer. The 1A EDG started and functioned normally. Troubleshooting identified a degraded relay downstream of the under voltage sensing circuit which made up the invalid 2/3 logic necessary to start the EDG. There were NO actual plant conditions or parameters (i.e. under voltage, degraded voltage, safety injection or manual initiation) involved in this actuation. The degraded relay would NOT have prevented the 1A Emergency Load Sequencer or the EDG from performing their safety related functions. Following troubleshooting, replacement of the relay and an evaluation for extent of condition, the 1A Emergency Load Sequencer and EDG were returned to service. The health and safety of the public was not affected by this issue. The NRC Resident Inspector has been notified. |
Where | |
---|---|
Mcguire North Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
Time - Person (Reporting Time:+1255.53 h52.314 days <br />7.473 weeks <br />1.72 months <br />) | |
Opened: | Scott Slieter 12:27 Jan 7, 2015 |
NRC Officer: | Daniel Mills |
Last Updated: | Jan 7, 2015 |
50720 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 50720\u003C/a\u003E - \u003Ca href=\"/McGuire\" title=\"McGuire\"\u003EMcGuire\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EInvalid Actuation of 1A Emergency Diesel Generator (Edg)\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 50720 - McGuire\n","link":"","lat":35.43065277777778,"lon":-80.9415,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (17 %) |
After | Power Operation (17 %) |
WEEKMONTHYEARENS 563452023-01-01T11:04:0001 January 2023 11:04:00
[Table view]10 CFR 50.73(a)(1), Submit an LER 60-DAY Optional Telephonic Notification of Invalid Actuation of Auxiliary Feedwater Pump ENS 507202014-11-16T04:55:00016 November 2014 04:55:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of 1A Emergency Diesel Generator (Edg) ENS 485502012-12-02T16:42:0002 December 2012 16:42:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Report - Invalid Auxiliary Feedwater and Nuclear Service Water Pump Actuation ENS 484432012-09-30T03:37:00030 September 2012 03:37:00 10 CFR 50.73(a)(1), Submit an LER Inadvertent Alignment of Nuclear Service Water to Standby Nuclear Service Water Pond ENS 459132010-04-16T09:21:00016 April 2010 09:21:00 10 CFR 50.73(a)(1), Submit an LER Inadvertent Steam Admission to Afw Turbine ENS 450062009-02-23T08:06:00023 February 2009 08:06:00 10 CFR 50.73(a)(1), Submit an LER Inadvertent Actuation of Turbine Auxiliary Feedwater Pump ENS 416352005-04-09T14:39:0009 April 2005 14:39:00 10 CFR 50.73(a)(1), Submit an LER Invalid Specified System Actuation ENS 411512004-10-20T00:20:00020 October 2004 00:20:00 10 CFR 50.73(a)(1), Submit an LER Invalid Turbine Driven Auxiliary Feedwater Actuation 2023-01-01T11:04:00 | |