ENS 45006
ENS Event | |
---|---|
08:06 Feb 23, 2009 | |
Title | Inadvertent Actuation of Turbine Auxiliary Feedwater Pump |
Event Description | On February 23, 2009 at 0406, with Unit 1 at 100% power level, McGuire Nuclear Station experienced an inadvertent actuation of the Unit 1 Turbine Driven Auxiliary/Emergency Feedwater (TDAFW) Pump. This event occurred when power was removed to the steam admittance solenoid valves for the Unit 1 TDAFW Pump prior to isolating the steam supply to the pump. Removing power to the steam admittance valves caused them to fail open, starting the pump and injecting water into all four Unit 1 Steam Generators (S/Gs). Flow to the S/Gs was isolated by manually closing the Unit 1 TDAFW discharge isolation valve to each S/G. During recovery from the event, power was restored to the steam admittance solenoid valves for the running Unit 1 TDAFW Pump. Restoration of power generated a pump auto start signal which resulted in inadvertent automatic closure of both trains of blowdown containment isolation valves and both trains of sample containment isolation valves for each Unit 1 S/G.
Subsequent evaluation of the event concluded that the actuation of the Unit 1 TDAFW Pump, S/G blowdown containment isolation valves, and S/G sample containment isolation valves was not the result of a valid signal initiated in response to actual plant conditions or parameters satisfying the requirements for initiation of the safety function provided by the respective component. In addition, the actuation of these components was not the result of an intentional manual initiation. Therefore, actuation of the Unit 1 TDAFW Pump, S/G blowdown containment isolation valves, and S/G sample containment isolation valves represented invalid actuations which are not reportable per the requirements of 10 CFR 50.72(b)(3)(iv)(A). Although the actuation of these components represented invalid actuations, they were not pre-planned, the systems were not removed from service, and the safety function provided by the components had not already been completed. Therefore, McGuire is reporting actuation of the Unit 1 TDAFW Pump, S/G blowdown containment isolation valves, and S/G sample containment isolation valves in accordance with the requirements of 10 CFR 50.73(a)(2)(iv)(A). Note that closing the Unit 1 TDAFW Pump discharge isolation valve to each S/G to isolate flow rendered the Unit 1 TDAFW inoperable. However, these valves were opened and the Unit 1 TDAFW Pump was restored to an operable status within the required completion time specified in the Auxiliary Feedwater System Technical Specification. As indicated in 10 CFR 50.73(a)(1), in the case of an invalid actuation reported under 10 CFR 50.73(a)(2)(iv)(A) other than actuation of the Reactor Protection System when the reactor is critical, the licensee may, at its option, provide a telephone notification to the NRC within 60 days after discovery of the event instead of submitting a written LER. In these cases the telephone report is not considered an LER. McGuire is exercising this option by providing this telephone notification. The following additional information is being provided as part of the telephone notification of this event: The Unit 1 TDAFW Pump injected water into all four Unit 1 S/Gs for approximately 3 and 1/2, minutes before flow was isolated by manually closing the Unit 1 TDAFW discharge isolation valve to each S/G. Subsequent evaluation determined that Unit 1 reactor power did not exceed 100% during the event. The actuation of the Unit 1 TDAFW Pump was complete and successful. This event actuated both trains of blowdown containment isolation valves and both trains of sample containment isolation valves for each Unit 1 S/G. Each train's actuation was complete and successful. The licensee has notified the NRC Resident Inspector. The TDAFW pump was being removed from service, and the steam admittance solenoid valves should have been isolated prior to removing power to them. |
Where | |
---|---|
Mcguire ![]() North Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
Time - Person (Reporting Time:+1375.28 h57.303 days <br />8.186 weeks <br />1.884 months <br />) | |
Opened: | Wayne Hoyle 14:23 Apr 21, 2009 |
NRC Officer: | Karl Diederich |
Last Updated: | Apr 21, 2009 |
45006 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 45006\u003C/a\u003E - \u003Ca href=\"/McGuire\" title=\"McGuire\"\u003EMcGuire\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EInadvertent Actuation of Turbine Auxiliary Feedwater Pump\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 45006 - McGuire\n","link":"","lat":35.43065277777778,"lon":-80.9415,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (85 %) |
WEEKMONTHYEARENS 563452023-01-01T11:04:0001 January 2023 11:04:00
[Table view]10 CFR 50.73(a)(1), Submit an LER 60-DAY Optional Telephonic Notification of Invalid Actuation of Auxiliary Feedwater Pump ENS 507202014-11-16T04:55:00016 November 2014 04:55:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of 1A Emergency Diesel Generator (Edg) ENS 485502012-12-02T16:42:0002 December 2012 16:42:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Report - Invalid Auxiliary Feedwater and Nuclear Service Water Pump Actuation ENS 484432012-09-30T03:37:00030 September 2012 03:37:00 10 CFR 50.73(a)(1), Submit an LER Inadvertent Alignment of Nuclear Service Water to Standby Nuclear Service Water Pond ENS 459132010-04-16T09:21:00016 April 2010 09:21:00 10 CFR 50.73(a)(1), Submit an LER Inadvertent Steam Admission to Afw Turbine ENS 450062009-02-23T08:06:00023 February 2009 08:06:00 10 CFR 50.73(a)(1), Submit an LER Inadvertent Actuation of Turbine Auxiliary Feedwater Pump ENS 416352005-04-09T14:39:0009 April 2005 14:39:00 10 CFR 50.73(a)(1), Submit an LER Invalid Specified System Actuation ENS 411512004-10-20T00:20:00020 October 2004 00:20:00 10 CFR 50.73(a)(1), Submit an LER Invalid Turbine Driven Auxiliary Feedwater Actuation 2023-01-01T11:04:00 | |