An interim report was made, as required per
10CFR21.21 (a)(2), of a deviation identified by AMEC Environment & Infrastructure, Inc. The CTLGroup, a supplier of AMEC, did not initially provide all the traceable calibration information required for all the chemicals used in performance of procured tests in regard to laboratory test data of screening tests for constituents related to Safety Class C concrete and
grout. An evaluation is underway, but could not be completed within 60 days of discovery. AMEC anticipates that the evaluation will be completed within two weeks of this correspondence, August 17, 2013.
Affected plants;
Vogtle Units 3 & 4 Safety Class C Concrete and Grout and VC Summer Units 2 & 3 Safety Class C Concrete and Grout.
Name and address of the individual or individuals informing the Commission.
Donald B. Chandler
AMEC Environment & Infrastructure, Inc.
4021 Stirrup Creek Drive, Suite 100
Durham, NC 27703
Phone # 919-381-9908
- * * UPDATE ON 8/26/13 AT 1323 EDT FROM CHANDLER TO HUFFMAN * * *
The following update was received from the licensee via facsimile:
The purpose of this letter is to follow up on the Interim Report of the Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2) provided to the Commission on August 3, 2013. The August 3rd report informed the Commission of a deviation identified by AMEC Environment & Infrastructure, Inc. (AMEC) where an evaluation was underway, but could not be completed within 60 days of discovery. The evaluation was completed by AMEC on August 8, 2013 and it was determined that the nonconformance did not represent a defect.
Notified R2DO (Haag) and sent copy to the Part 21 e-mail group.