| Title | Part 21 - Defective Plug Insulators |
| Event Description | The following report was received via fax:
This letter is issued to provide initial notification of a potential defect in Plug Insulators (P/N: GB-1A-1) supplied as part of GRAYBOOT 'A' (GB-1A) Connector Kits. There are two affected lots of Plug Insulators (Lot #: BA59961 and BA67711). The potential defect is an out of tolerance dimension that will possibly affect the sealing ability of the Plug Insulator to wire interface. The affected Customers and their associated Purchase Orders are listed below. All Customers will be notified today. Ralph a. Hiller; PO: NUC7505, Item 1, 15 Kits (P/N: GB-1A [16-18], Lot BA59961) supplied 19JAN2012. Bruce Power, PO: 00168187, Item 1, 20 Kits (P/N: GB-1A [12-14], Lot BA59961) supplied 13DEC2011. Dominion - Surry, PO: 45886290, Item 1, 22 Kits (P/N: GB-S-1A, Lot BA59961) supplied 19DEC2011. Dominion - Surry, PO: 45897749, Item 2, 30 Kits (P/N: GB-S-1A, Lot BA67711) supplied 01FEB2012. Ringhals AB, PO: 621728-053, Item 10, 30 Kits (P/N: GB-1A [16-18], Lot BA59961) supplied 19DEC2011. Ringhals, PO: 620625-066, Item 10, 300 parts (P/N: GB-1A-1, Lots BA59961/BA67711) supplied 30JAN2012. Ringhals, PO: 620996-066, Item 50, 1 Kit (P/N: GB-1A [16-18], Lot BA59961) supplied 29NOV2011. OKG, PO: 4113847, Item 4, 86 parts (P/N: GB-1A-1, Lot BA59961) supplied 30NOV2011. It is requested that all affected parts be returned for replacement to QualTech NP; 330 West Park Loop; Huntsville, AL 35806. Customers can contact Cindy Tidwell at (256) 895-7250 ext. 229 for freight collect shipping instructions. Additional details, corrective actions and root causes will be provided once complete. If you require additional information or would like to discuss this further please do not hesitate in contacting: Tony Gill Quality Assurance Supervisor QualTech NP, Huntsville A business unit of Curtiss-Wright Flow Control Company Office 256-722-8500 ext. 1 Cell 256-426-4558 tgill@curtisswright.com
This letter provides for the formal closeout of notification 10CFR21-2012-01. The initial notification was made on February 06, 2012. All corrective actions and corrective actions to prevent recurrence have been completed and all affected parts listed on the initial notification have been returned by our customers and replacement items supplied. All affected parts in inventory at our facility were removed and discarded. The initial corrective action was to retrieve all affected parts both in our inventory and those provided to our customers as safety-related. As stated above, all affected parts have been returned and/or retrieved from inventory and discarded. There were four primary root causes identified that allowed the defective items to be manufactured and accepted. The causes are listed below: 1. Mold sections/mold inserts for the two different size plug insulators (regular and oversized) are used in the same mold assembly. Not all required mold parts were removed when changing from the manufacture of oversized to regular boots causing the defective parts to be manufactured. 2. Vendor did not verify the affected dimension prior to shipment of the parts to QualTech. 3. The inspection drawing in the QualTech dedication guidelines was not clear as to the required dimension to be verified. 4. The QualTech Inspector incorrectly interpreted the inspection drawing and verified the wrong dimension thus accepting the defective parts. The corrective actions to prevent recurrence have been completed and include the following: 1. An additional mold was purchased from our supplier to prevent mixing of inserts. Now there are no mold parts utilized in the manufacture of different sized plug insulators (regular vs. oversized). This issue was one of the primary causes of the defect. 2. Notification was made to our supplier and corrective actions implemented at their facility. 3. The QualTech inspection drawing in the affected dedication guidelines was revised to better define the required dimension. 4. The error was discussed with the QualTech Inspector to ensure understanding of the critical dimension. Based on the above information and corrective actions this part 21 file is considered closed. If you would like to discuss this information further please contact the undersigned at 256-722-8500 ext. 131 (office), 256-426-4558 (cell), or tgill@curtisswright.com. Tony Gill Quality Assurance Manager QualTech NP, Huntsville Operations a business unit of Curtiss-Wright Flow Control Company Notified R2DO (Haig) and the Part 21 Group via email. |
| Where | |
|---|---|
| Curtiss Wright Flow Control Co. Huntsville, Alabama (NRC Region 1) | |
| Organization: | Curtiss Wright Flow Control Co. |
| Reporting | |
| 10 CFR 21.21 | |
| Time - Person (Reporting Time:+11.93 h0.497 days <br />0.071 weeks <br />0.0163 months <br />) | |
| Opened: | Tony Gill 17:56 Feb 6, 2012 |
| NRC Officer: | Charles Teal |
| Last Updated: | Feb 3, 2013 |
| 47643 - NRC Website | |
Curtiss Wright Flow Control Co. with 10 CFR 21.21, Notification of failure to comply or existence of a defect and its evaluation | |
WEEKMONTHYEARENS 476432012-02-06T06:00:0006 February 2012 06:00:00
[Table view]10 CFR 21.21, Notification of failure to comply or existence of a defect and its evaluation Part 21 - Defective Plug Insulators ENS 467762011-04-22T05:00:00022 April 2011 05:00:00 10 CFR 21.21, Notification of failure to comply or existence of a defect and its evaluation Potential Defect in Submersible Valve Position Sensors 2012-02-06T06:00:00 | |