ENS 47622
ENS Event | |
---|---|
03:00 Jan 26, 2012 | |
Title | Technical Support Center Out of Service Due to Planned Maintenance |
Event Description | Planned preventive maintenance activities are being performed on the Braidwood Nuclear Station Technical Support Center (TSC) Ventilation System. These work activities are planned to be performed and completed expeditiously within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. This maintenance activity includes the performance of preventive maintenance on the TSC outside air supply fan unit which affects the TSC emergency filter train and air handling unit. During a portion of the time these activities are being performed, this equipment will not be available for operation. As such, the TSC Ventilation will be rendered non-functional during the performance of portions of the work activity.
If an emergency condition occurs that requires activation of the Technical Support Center, during the time this work activity is being performed, it will take no more than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to return the equipment back to functional status, dependent on the stage of the work activity at the time an emergency occurs. Plans are to utilize the TSC for any declared emergency during the time this work activity is being performed as long as radiological conditions allow. This event is reportable per 10CFR50.72(b)(3)(xiii) as described in NUREG-1022, Rev. 2 since this work activity affects an emergency response facility for the duration of the maintenance. The licensee notified the NRC Resident Inspector.
Braidwood Nuclear Station TSC ventilation was restored to available status at 0635 CST on January 26, 2012. The previously reported system preventative maintenance has been completed. The licensee notified the NRC Resident Inspector. Notified R3DO (L. Kozak). |
Where | |
---|---|
Braidwood Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-5.35 h-0.223 days <br />-0.0318 weeks <br />-0.00733 months <br />) | |
Opened: | Ryan Szczesniak 21:39 Jan 25, 2012 |
NRC Officer: | Vince Klco |
Last Updated: | Jan 26, 2012 |
47622 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 47622\u003C/a\u003E - \u003Ca href=\"/Braidwood\" title=\"Braidwood\"\u003EBraidwood\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETechnical Support Center Out of Service Due to Planned Maintenance\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 47622 - Braidwood\n","link":"","lat":41.24283055555556,"lon":-88.2290111111111,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 563522023-02-06T11:30:0006 February 2023 11:30:00
[Table view]10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Communications and Assessment Capabilities ENS 553252021-06-24T14:01:00024 June 2021 14:01:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Technical Support Center Capability ENS 540902019-05-26T00:30:00026 May 2019 00:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Main Control Room Area Radiation Monitors ENS 531802018-01-23T10:00:00023 January 2018 10:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Assessment Capability Due to Technical Support Center Planned Maintenance ENS 521032016-07-18T20:00:00018 July 2016 20:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Offsite Communications Capability ENS 511542015-06-15T12:00:00015 June 2015 12:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Tsc Ventilation to Be Removed from Service for Planned Maintenance ENS 510922015-05-27T14:45:00027 May 2015 14:45:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Out of Service for Planned Maintenance ENS 509572015-04-06T13:09:0006 April 2015 13:09:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Out of Service for Planned Maintenance ENS 509332015-03-27T14:41:00027 March 2015 14:41:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Seismic Monitor Not Available for Emergency Plan Assessment ENS 504312014-09-06T11:13:0006 September 2014 11:13:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Air Conditioning Condensing Units Out of Service ENS 503972014-08-25T10:00:00025 August 2014 10:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Planned Maintenance ENS 502472014-07-01T12:15:0001 July 2014 12:15:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Offsite Alert and Notification System Failure ENS 501622014-06-01T18:14:0001 June 2014 18:14:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Technical Support Center Cooling Capability ENS 497232013-10-16T19:20:00016 October 2013 19:20:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Out of Service ENS 483282012-09-21T01:35:00021 September 2012 01:35:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Ventilation Inoperable ENS 478452012-04-18T02:30:00018 April 2012 02:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Plant Process Computer Removed from Service for Planned Replacement ENS 476222012-01-26T03:00:00026 January 2012 03:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Out of Service Due to Planned Maintenance ENS 467662011-04-19T04:09:00019 April 2011 04:09:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Plant Process Computer Removed from Service for Planned Replacement ENS 435902007-08-23T20:30:00023 August 2007 20:30:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Manual Reactor Trip Because of Lowering Condenser Vacuum ENS 431372007-02-01T15:25:0001 February 2007 15:25:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Offsite Phone Connections ENS 418582005-07-21T00:17:00021 July 2005 00:17:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Emergency Sirens Failed for One Hour ENS 409222004-08-04T12:15:0004 August 2004 12:15:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Notification Due to Inoperable Sirens 2023-02-06T11:30:00 | |