ENS 47193
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
18:06 Aug 23, 2011 | |
Title | Notification of an Unusual Event Due to a Seismic Event |
Event Description | The licensee declared a Notification of Unusual Event (NOUE) under EAL HU1.1 based on an earthquake felt at the plant with confirmation by the National Earthquake Center. They have made state and local notifications and notified the NRC Resident Inspector.
The licensee has terminated from the NOUE at 1757 EDT. The termination basis was that no safety equipment was impacted by the earthquake and walkdowns of plant safety equipment was complete. The licensee has notified the NRC Resident Inspector and state and local authorities Notified R2 IRC (Franke), IRD (Gott), DHS (Bean), FEMA (Via), USDA (Kraus), and DOE (Turner). |
Where | |
---|---|
Harris North Carolina (NRC Region 2) | |
Reporting | |
Emergency class: | Unusual Event |
10 CFR 50.72(a) (1) (i), Emergency Class Declaration | |
Time - Person (Reporting Time:+-2.65 h-0.11 days <br />-0.0158 weeks <br />-0.00363 months <br />) | |
Opened: | Al Bostic 15:27 Aug 23, 2011 |
NRC Officer: | Dong Park |
Last Updated: | Aug 23, 2011 |
47193 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 47193\u003C/a\u003E - \u003Ca href=\"/Harris\" title=\"Harris\"\u003EHarris\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ENotification of an Unusual Event Due to a Seismic Event\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 47193 - Harris\n","link":"","lat":35.63344166666667,"lon":-78.95586666666667,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_47193&oldid=424429"