ENS 46127
ENS Event | |
---|---|
17:14 May 25, 2010 | |
Title | 60-Day Optional Report for Inadvertent Safety Injection System Actuation |
Event Description | At 1314 hours0.0152 days <br />0.365 hours <br />0.00217 weeks <br />4.99977e-4 months <br /> [EDT] on May 25, 2010, with the unit defueled during Refueling Outage 26, an inadvertent Safety Injection (SI) Signal occurred. The signal was received when Safeguards Train 'A' breaker DP-A-20 was closed during the performance of procedure PIC-020, 'Time Delay Relay Calibration Safeguards Train 'A'.' The SI Signal resulted in a containment phase 'A' isolation, containment ventilation isolation, control room ventilation transfer to emergency pressurization mode, and Radiation Monitors R-11 and R-12 (Containment Vessel Airborne Particulate and Gas Monitors) isolation. Emergency Bus 1 and Emergency Diesel Generator 'A' were under clearance, including the Train 'A' sequencer. Therefore, automatic loading of the 'A' Train Sequencer did not occur and no actual injection into the reactor vessel occurred. The affected systems actuated as expected.
The cause of the inadvertent SI Signal resulted from SI Initiation Latching Relay SIA1 when power was restored to Safeguards Rack 51. Subsequent investigation determined the SIA1 relay was in an unexpected position (i.e., latched). The SIA1 relay likely became inadvertently latched while performing cable pulls in Safeguards Rack 51 for work associated with Water Cooled Condensing Unit 1A. Corrective actions include a revision to a procedure to address additional steps to require reset of SI Initiation Latching Relays SIA1 and SIA2 after cleaning and lubrication and development of a planning tool to better assess the risk associated with work being performed [on] plant equipment. In addition, a procedure will be developed for Operations to manually reset safeguards SI Initiation Latching Relays SIA1 and SIA2 prior to restoring system power. These actions are expected to be completed before or on December 16, 2010. The licensee has notified the NRC Resident Inspector. |
Where | |
---|---|
Robinson South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
Time - Person (Reporting Time:+1485.07 h61.878 days <br />8.84 weeks <br />2.034 months <br />) | |
Opened: | Ashley Valone 14:18 Jul 26, 2010 |
NRC Officer: | Howie Crouch |
Last Updated: | Jul 26, 2010 |
46127 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 46127\u003C/a\u003E - \u003Ca href=\"/Robinson\" title=\"Robinson\"\u003ERobinson\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E60-Day Optional Report for Inadvertent Safety Injection System Actuation\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 46127 - Robinson\n","link":"","lat":34.40111111111111,"lon":-80.15933333333334,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
WEEKMONTHYEARENS 550792020-12-01T14:46:0001 December 2020 14:46:00
[Table view]10 CFR 50.73(a)(1), Submit an LER 60-DAY Optional Telephonic Notification of an Invalid Specified System Actuation ENS 461272010-05-25T17:14:00025 May 2010 17:14:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Report for Inadvertent Safety Injection System Actuation ENS 434502007-05-02T03:39:0002 May 2007 03:39:00 10 CFR 50.73(a)(1), Submit an LER Invalid System Actuation ENS 420842005-08-31T22:05:00031 August 2005 22:05:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of an Emergency Diesel Generator 2020-12-01T14:46:00 | |