ENS 43889
ENS Event | |
---|---|
15:13 Oct 13, 2007 | |
Title | 60 Day Ler Report - 1C Edg Invalid Start |
Event Description | This 60-day telephone notification is being made in accordance with the reporting requirements of 10CFR50.73(a)(2)(iv)(A) and 10CFR50.73(a)(1) for an invalid actuation (start) of the 1C Emergency Diesel Generator (EDG).
On November 13, 2007, at 1013 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.854465e-4 months <br />, while performing the replacement of an indicating bulb on the 1C EDG local start/stop CMC switch (a turn to stop/start switch) the switch was pushed inward making up the start contact and causing an inadvertent start of the 1C EDG. The EDG started but did not load since this was not a valid demand for operation of the 1C EDG. The 1C EDG was shutdown in accordance with operating procedures and returned to its normal standby status. The local start/stop switch was replaced and the removed switch was examined. The removed switch was determined to be missing a cardboard collar on the shaft of the switch that prevents inward movement. Lack of the cardboard collar did not inhibit the turn to start/stop function of the switch. The licensee will notify the NRC Resident Inspector, State of New Jersey, State of Delaware, and local government agencies. |
Where | |
---|---|
Salem New Jersey (NRC Region 1) | |
Reporting | |
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
Time - Person (Reporting Time:+2132.15 h88.84 days <br />12.691 weeks <br />2.921 months <br />) | |
Opened: | Gary Meekins 12:22 Jan 10, 2008 |
NRC Officer: | Karl Diederich |
Last Updated: | Jan 10, 2008 |
43889 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 43889\u003C/a\u003E - \u003Ca href=\"/Salem\" title=\"Salem\"\u003ESalem\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E60 Day Ler Report - 1C Edg Invalid Start\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 43889 - Salem\n","link":"","lat":39.46302222222222,"lon":-75.53561388888889,"icon":"/w/images/c/cc/PSEG_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 537862018-10-15T04:00:00015 October 2018 04:00:00
[Table view]10 CFR 50.73(a)(1), Submit an LER Invalid Auxiliary Feedwater Pump Actuation ENS 528052017-04-16T14:53:00016 April 2017 14:53:00 10 CFR 50.73(a)(1), Submit an LER Invalid Edg Actuation During Surveillance Testing ENS 520072016-04-18T01:04:00018 April 2016 01:04:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Emergency Diesel Generator ENS 516242015-10-29T16:12:00029 October 2015 16:12:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Unit 2 2C Safeguards Equipment Cabinet ENS 486672012-11-14T20:58:00014 November 2012 20:58:00 10 CFR 50.73(a)(1), Submit an LER 60 Day Telephone Notification of an Invalid Reactor Trip Actuation in Mode 4 ENS 438892007-10-13T15:13:00013 October 2007 15:13:00 10 CFR 50.73(a)(1), Submit an LER 60 Day Ler Report - 1C Edg Invalid Start ENS 434282007-04-17T02:23:00017 April 2007 02:23:00 10 CFR 50.73(a)(1), Submit an LER Invalid Esf Actuation During Refueling Outage ENS 408062004-04-12T19:43:00012 April 2004 19:43:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Notification of Invalid Actuation of Safety Injection Signal 2018-10-15T04:00:00 | |