ENS 43424
ENS Event | |
|---|---|
23:19 Jun 14, 2007 | |
| Title | Tech Spec. Required Shutdown Due to 72 Hour Completion Time Not Met |
| Event Description | At 1819 hours0.0211 days <br />0.505 hours <br />0.00301 weeks <br />6.921295e-4 months <br />, an orderly shutdown on Unit 1 commenced as the result of Technical Specification Action Condition (TSAC) 3.7.5.B.1 completion time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> not being met for the 1P-29 turbine-driven auxiliary feedwater pump. The pump was declared inoperable on June 12, 2007, at 0131 hours0.00152 days <br />0.0364 hours <br />2.166005e-4 weeks <br />4.98455e-5 months <br /> as a result of high pump bearing temperatures. Repairs and testing performed to date have not satisfactorily resolved the problem.
This non-emergency notification is being made in accordance with 10CFR50.72(b)(2)(i). The PBNP resident inspector has been notified. The licensee plans to conduct an extended duration test of the 1P-29 AFW pump. This test is scheduled to commence shortly and will last approximately 4 to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The licensee will have two different hold points in the test to take pump bearing temperature data. The licensee has one emergency diesel generator (EDG) out of service (OOS), but an alternate EDG is aligned to ensure all four vital buses have vital power in the event of an loss of offsite power. No other safety related systems are OOS at this time. The licensee notified the NRC Resident Inspector.
This is an update to EN#43424: Regarding Unit 1 turbine driven auxiliary feedwater pump inoperability and Technical Specification required shutdown. PBNP Unit 1 entered MODE 3 on 6/15/07 at 0407. PBNP Unit 1 entered MODE 4 on 6/15/07 at 1712. Technical Specification Action Condition 3.7.5.D.1 required Unit 1 to be in MODE 3 by 0731 and MODE 4 by 1931 on 6/15/07. All Technical Specification Required Actions for the AFW pump OOS have been met within the required times. The licensee informed the NRC Resident Inspector. Notified R3DO(Stone). |
| Where | |
|---|---|
| Point Beach Wisconsin (NRC Region 3) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
| Time - Person (Reporting Time:+-2.97 h-0.124 days <br />-0.0177 weeks <br />-0.00407 months <br />) | |
| Opened: | Rick Robbins 20:21 Jun 14, 2007 |
| NRC Officer: | Joe O'Hara |
| Last Updated: | Jun 15, 2007 |
| 43424 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 43424\u003C/a\u003E - \u003Ca href=\"/Point_Beach\" title=\"Point Beach\"\u003EPoint Beach\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETech Spec. Required Shutdown Due to 72 Hour Completion Time Not Met\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 43424 - Point Beach\n","link":"","lat":44.280972222222225,"lon":-87.53674444444445,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (98 %) |
WEEKMONTHYEARENS 503962014-08-24T05:00:00024 August 2014 05:00:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Post Accident Monitoring Instrumentation Out of Service ENS 464752010-12-13T18:10:00013 December 2010 18:10:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Not Meeting Rod Group Allignment Limits ENS 439072008-01-15T20:15:00015 January 2008 20:15:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unusual Event - Loss of Offsite Power ENS 436492007-09-18T13:43:00018 September 2007 13:43:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Refueling Water Storage Tank Temperature Above Operating Limits ENS 434242007-06-14T23:19:00014 June 2007 23:19:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Tech Spec. Required Shutdown Due to 72 Hour Completion Time Not Met ENS 421092005-11-02T05:00:0002 November 2005 05:00:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Tech Spec Required Shutdown Due to Degradation of Containment Coatings ENS 414472005-02-27T17:58:00027 February 2005 17:58:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Loss of Dc Battery Chargers ENS 412122004-11-19T22:22:00019 November 2004 22:22:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to a Steam Leak on an Instrument Isolation Valve Inside Containment ENS 406262004-03-30T18:15:00030 March 2004 18:15:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Safety Injection Accumulator Level Greater than Allowed by Technical Specification 2014-08-24T05:00:00 | |