ENS 42125
ENS Event | |
---|---|
08:58 Nov 8, 2005 | |
Title | Reactor Trip Due to Reactor Coolant Pump Bus Undervoltage |
Event Description | At 03:58 on 11-08-05, D.C. Cook Unit 2 experienced an automatic, reactor trip due to Reactor Coolant Pump Bus Undervoltage. The cause of the reactor trip its under investigation. This requires a 4-hour report under 10CFR50.72(b)(2)(iv)(B).
All four reactor coolant pumps have remained running. The Unit 2 Turbine Driven Auxiliary Feedwater Rump (TDAFP) started automatically due to low-low levels in at least two steam generators which is expected for a reactor trip from 100% power. The 'B' train Emergency Diesel Generator (2AB EDG) automatically started and loaded "B" train emergency bus T21A. These automatic actuations of the reactor protection system, TDAFP start, and 2A13 EDG start require an 8-hour report under I OCFR50.72(b)(3)(iv)(A). 'B' train emergency bus T21B was declared inoperable after it failed to be energized automatically on the start of the 2AB EDG. The cause of this failure is under investigation. The 'A' train Emergency Diesel Generator (2CD EDG) had been inoperable for scheduled maintenance during the time of the event. It was restored to operable status at 06:06. All control rods fully inserted. Steam generators are discharging steam to the main condenser using steam dumps. The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Cook Michigan (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-1.8 h-0.075 days <br />-0.0107 weeks <br />-0.00247 months <br />) | |
Opened: | Bud Hinckley 07:10 Nov 8, 2005 |
NRC Officer: | Bill Gott |
Last Updated: | Nov 8, 2005 |
42125 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 42125\u003C/a\u003E - \u003Ca href=\"/Cook\" title=\"Cook\"\u003ECook\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EReactor Trip Due to Reactor Coolant Pump Bus Undervoltage\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 42125 - Cook\n","link":"","lat":41.97790555555556,"lon":-86.56431666666667,"icon":"/w/images/3/39/American_Electric_Power_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | A/R |
Before | Power Operation (100 %) |
After | Hot Standby (0 %) |
Cook with 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation | ||
WEEKMONTHYEARENS 571952024-06-27T12:04:00027 June 2024 12:04:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Start of Turbine Driven Auxiliary Feedwater Pump ENS 571282024-05-15T08:27:00015 May 2024 08:27:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 2 Manual Reactor Trip ENS 562162022-11-10T12:44:00010 November 2022 12:44:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip and Auxiliary Feedwater System Actuation ENS 560762022-08-28T17:48:00028 August 2022 17:48:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Reactor Coolant Pump Trip ENS 559102022-05-24T08:14:00024 May 2022 08:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Following Manual Turbine Trip from High Vibrations on Main Turbine ENS 553222021-06-23T03:31:00023 June 2021 03:31:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Rx Trip Due to Steam Leak in Moisture Separator Re-Heater Crossover Pipe ENS 549442020-10-12T04:26:00012 October 2020 04:26:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation | Automatic Reactor Trip ENS 541762019-07-21T12:26:00021 July 2019 12:26:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due Non-Essential Service Water System Degraded Condition ENS 533872018-05-07T07:36:0007 May 2018 07:36:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Rx Trip Due to High-High Level in Moisture Separator Drain Tank ENS 533342018-04-13T19:55:00013 April 2018 19:55:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Emergency Diesel Generator Start During Testing ENS 520652016-07-06T04:38:0006 July 2016 04:38:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip and Unusual Event Declaration Due to Steam Leak in Turbine Building ENS 510042015-04-23T06:10:00023 April 2015 06:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Manual Reactor Trip Due to a Secondary Plant Transient ENS 505872014-11-01T06:48:0001 November 2014 06:48:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Dual Unit Manual Reactor Trips Due to Lowering Condenser Vacuum and Degraded Forebay ENS 492202013-07-28T14:18:00028 July 2013 14:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Following Secondary Plant Transient ENS 489642013-04-24T18:11:00024 April 2013 18:11:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Actuation of an Emergency Diesel Generator Due to a Loss of Train a Reserve Feed to the Site ENS 478812012-05-01T03:28:0001 May 2012 03:28:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Main Turbine Trip ENS 474772011-11-25T10:23:00025 November 2011 10:23:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Aux Feedwater Pump Start After Main Feedwater Pump Trip ENS 472472011-09-07T12:54:0007 September 2011 12:54:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Following Main Turbine Trip from 100% Power ENS 464772010-12-14T02:19:00014 December 2010 02:19:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Actuation of Auxiliary Feedwater System in Response to Loss of One Main Feedwater Pump ENS 463112010-10-06T04:08:0006 October 2010 04:08:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Actuation of Auxiliary Feedwater System in Response to Valid Steam Generator Low-Low Level Signals ENS 458932010-05-02T12:58:0002 May 2010 12:58:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Actuation of Auxiliary Feedwater System in Response to Loss of One Main Feedwater Pump ENS 452282009-07-26T19:06:00026 July 2009 19:06:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to a Reactor Coolant Pump Seal Malfunction ENS 445072008-09-21T00:18:00021 September 2008 00:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Manual Reactor Trip from 100% Power Due to a Fire in the Main Turbine ENS 439562008-02-02T10:30:0002 February 2008 10:30:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to High Turbine Vibrations ENS 436052007-08-28T17:54:00028 August 2007 17:54:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip After Digital Feedwater System Failure ENS 425312006-04-27T06:07:00027 April 2006 06:07:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Low Pressure Steam Line Pressure Safety Injection Signal Inadvertently Initiated ENS 421252005-11-08T08:58:0008 November 2005 08:58:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip Due to Reactor Coolant Pump Bus Undervoltage ENS 416392005-04-26T04:02:00026 April 2005 04:02:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip with Afw Actuation ENS 406602004-04-09T02:16:0009 April 2004 02:16:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to a Feedwater Flow Transient ENS 406222004-03-29T19:04:00029 March 2004 19:04:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip During Reactor Trip Bypass Breaker Manipulation Test ENS 404192003-12-30T18:30:00030 December 2003 18:30:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Tripped from 100% Power Due to Low Steam Generator 2024-06-27T12:04:00 [Table view] | |