1035 hours0.012 days <br />0.288 hours <br />0.00171 weeks <br />3.938175e-4 months <br /> on the morning of 3/28/05, investigation into a previously reported leak (Event #41530) identified an approximate 3 inch through wall flaw at the welded junction of the 4 inch diameter decon port and the 28 inch diameter 'B' Reactor Recirculation Systems pump suction piping. The identification of the indication required the removal of insulation in order to complete the inspection. The
unidentified leakage rate is below Tech Spec limits and the leak location is within the isolable boundary of the 'B'
Reactor Recirculation Pump. This failure constitutes a welding or material defect in the primary coolant system that is not acceptable under
ASME Section XI for
ASME Code Class 1 piping.
This report is being made under Hope Creek Event Classification Guide RAL# 11.2.1 in accordance with 10CFR50.72(b)(3)(ii). At the time of this notification, the Hope Creek Generating Station is in OPCON 4 at 150 degrees reactor coolant temperature to support piping repairs.
The licensee informed the
Lower Alloways Creek Township and NRC Resident Inspector.