The design data used to support Dominion's methodology to cope with a loss of [RCP] seal cooling (which was based on
Westinghouse WCAP-10541 Rev. 2) may be non-conservative. The NRC issued an
SER on
Westinghouse report
WCAP-15603 that indicates data from this new model must consider a 20% probability that the hot
RCP seals may result in up to 182 gpm leakage per pump if seal cooling is lost for more than 13 minutes. Assuming this higher leak rate, the requirements of Appendix R,
Section III.L, cannot be met since Pressurizer level could not be maintained. Current methodology indicates Surry will lose charging and seal cooling for greater than 13 minutes from a fire in the Emergency Switchgear Room. This report is being made pursuant to
10 CFR 50.72 (b)(3)(ii)(B).
The NRC resident [inspector] was notified of this condition.