ELV-02165, Special Rept 2-90-03:on 900914,invalid Diesel Generator Failure Occurred Due to Crack in Fuel Line Tubing.New Tubing Installed & Bent Appropriately
| ML20065G769 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/15/1990 |
| From: | Hairston W GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 2-90-03, 2-90-3, ELV-02165, ELV-2165, NUDOCS 9010230167 | |
| Download: ML20065G769 (2) | |
Text
_ _ _ _,_ _ _ _ _ _ _ _ _ _ _ _. - - - - - - - - - - - - - - - - - - ' - - - - - - ' - ~ ' ~ ~ ~ ~ ~
~ ~ ~ ' ~ ~
. Georgia Poor Cornpany.
333 Piodmort Avenue
)
. Attanta GeorD'a 30308
~ ]
. Telephone 404 526 3195 j
Mgng Address 40 inverness Contor Parkway Post Office Box 1295 B,rmingharn, Alabama 35201 Telephone 205 868 5581
^
the soutten Actnc sprem '
W. G, Hairston, lli Servor Vice Prevdent
's nuciear operatons October 15, 1990 ELV-02165-0647 Docket No.
50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk.
Washington, D. C.
20555 Gentlemen:
V0GTLE ELECTRIC. GENERATING PLANT'
.SPECIAL REPORT
- i INVALID DIESEL GENERATOR FAILURE In accordance with the requirements of the Vogtle Electric Generating Plan't Technical Specifications, Sections 4.8.1.1.3; and.6.8.2, Georgia Power Company.
hereby submits the enclosed SpecialiReport concerning ant invalid. diesel generator failure.
~
- Sincerely,.
k)
W. G. Hairston, III WGH,III/NJS/gm j
Enclosure:
Special Report 2-90-03 xc:- Georaia Power Comoany Mr. C. K. McCoy Mr. G. Bockhold, Jr.
Mr. P. D. Rushton 3
l Mr. R. M. Odom
]
NORMS L
U. S. Nuclear Reaulatory Commission
(.
Mr. S. D. Ebneter,4 Regional Administrator J
Mr. D. S. Hood, Licensing Project Manager, NRR-R Mr. B. R. Bonser, Senior Resident Inspector, Vogtle-L g
9h17d323f67 901015 i
PDR ADOCK 05000425
.A l-S PDC 6f Q.
-=-v w
6
l I
i 1
ENCLOSURE-V0GTLE ELECTRIC GENERATING PLANT - UNIT 1 TECHNICAL SPECIFICATION SPECIAL REPORT 2-90-03 INVALID DIESEL GENERATOR FAILURE-
)
A.
REQUIREMENT FOR REPORT This report is required in accordance with.the~ Vogtle Electric Generating l
Plant Technical Specifications, Section 4.8.1.1.3.
This section of the l
Technical Specifications requires.that all diesel: generator failures, valid or non-valid, be reported to the Commission in-a Special Report -
pursuant to Technical Specification 6.8.2.
j B.
DESCRIPTION OF INVALID FAILURE OF DIESEL GENERATOR:(DG) 2B' L
On 9-14-90 at 2330 CDT, DG 2B was started to perform.a Hot Web Deflection Test-in order to obtain thermodynamic performance' data prior to its scheduled overhaul. At 0410 CDT on 9-15-90, a fuel-line was.found ta be leaking and a conservative decision was made to stop,the-test and i
investigate the leak. At 0412 CDT, the DG was stopped and a. Limiting Contiition for Operation.was entered. -Personnel found that the fuel line i
tubing was mounted at an angle through one ofEits, supports and had cracked where it made contact with an edge of the' support.. A temporary-repair was made and the testing was completed. 2Dur,ing the-ensuing-overhaul, new tubing was installed which was' bentfappropriately as it:
passed through its support mounting to preventaa' recurrence of the cracked line. A check of the other DG ' fuel lines found no other. similar-conditions.
Following the overhaul, the DG1was_ returned to service on.
.i 9-25-90 at 1000 CDT.
C.
SUPfiARY This event is classified as an invalid failure per Regulatory Guide 1.108, Section C.2.e.
There'have been a total of 37' valid tests of DG 28 and no valid failures. The test frequency for DG 2B remains at once per 31 days in accordance with Table 4.8-1 of the Technical; Specifications.
i i-v
'.