DCL-94-106, Forwards PDR Version of Revised Epips,Including Vol 3B to Table of Contents,Rev 14A to EP G-4,Rev 4A to EP RB-10 & Rev 4A to EP RB-12.W/release Memo
| ML20073S310 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/10/1994 |
| From: | Sexton J PACIFIC GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20073S313 | List: |
| References | |
| DCL-94-106, GL-81-27, NUDOCS 9406010118 | |
| Download: ML20073S310 (3) | |
Text
!t Pacific Gas and Electric Company Nuce Reg n n Sr.m:1AG Jm A smy
)
333 f/ arm 5: ee h3 PO Bax 7K L:er En mer,se :.
Sar F r. m CA 9 " "
, E97327 Fat W973 3074 l
May 10,1994 PG&E Letter No. DCL-94-106 E
ATTN:
U.S. Nuclear Regulatory Con. mission Document Control Des l:
l Washington, D.C. 20555 l
Docket No. 50-275, OL-DPR-80 l
Docket No. 50-323, OL-DPR-82' Diablo Canyon Units 1 and 2 Emeraency Plan imolementina Procedure Undate l
l Gentlemen:
l In accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E, enc.'osed is one copy of the update to the Detailed Emergency Plan implementing Procedures for the Diablo Canyon Power Plant, Units 1 and 2 Emergency Plan. Two copies of the update are being submitted to the NRC R79 on IV Office and one copy is being submitted to the NRC Resident i
inspector.
This updato contains privacy / proprietary information that has been bracketed in accordance with NRC Generic Letter 81-27, " Privacy and Proprietary Material in Emergency Plans."
Sincerely, James A. Sexton cc:
Leonard J. Callan (2)
Mary H. Miller Sheri R. Peterson (w/o enc)
Enclosure 6456S/DDS/1345
.J m.
.s.m c 1
\\
s\\
l 9406010118 940510 PDR ADOCK 05000275 F
l SSKfoy
'o UNITED STATES
[
k NUCLEAR REGULATORY _ COMMISSION E
WASHINGTON, D. C. 20555 f
f y, at f6 Os 3 47 )
-78/Y?
MEMORANDUM FOR:
Chief Document Control Branch,-IRM i
FROM:
Acting Director, Division of Freedom of Information and Publications Services, ADM l
SUBJECT:
REV7EW OF UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Freedom of Information and Publications Services has reviewed the attached document and has determined that it may i
now be made publicly available.
j i
.A Walter E. Oliu, Acting irector Division of Freedom of Information and Publications Services Office of Administration l
1 i
s I '
ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM
,'N
[
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9405t70266--
DOC.DATE: 94/05/10 NOTARIZED: NO DOCKET #
FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION SEXTON Pacific Gas & Electric Co.
RECIP.NAME RECIPIENT AFFILIATION R
Document Control Branch (Document Control Desk)
SUBJECT:
Forwards Central Files version of revised EPIPs, including I
Vol 3B to table of contents,Rev 14A to EP G-4,Rev 4A to EP RB-10 & Rev 4A to EP RB-12. Withheld.
D
!W COPIES RECEIVED:LTR [ ENCL
/
SIZE:
DISTRIBUTION CODE: AX45D S
TITLE: Emergency Plan or Implementing Procedures (Prop Hetary)
/
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL D
PDIV-3 PD 1
1 MILLER,M 1
1
. DM7pE~PSRR/DRSS7PEPB~k D
INTERNAL:
1 1
AEOD/DOA/IRB 1
1 1
1 REG FILE 01 1
1 g
R 1
D S
/
A D
D NOTE TO ALL " RIDS" RECIPIENTS:
S PLEASE HELP US TO REDUCE WASTE! CONTACT THE IX)CUN1ENT CONTROL DESK, ROON1 Pl-37 (EXT. 20079) TO ELIN11NATE YOUR NAN 1E FRON1 DISTRIBUTION LISTS FOR DOCUN1ENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 6
ENCL 6
4
,