Forwards Diablo Canyon Unit 2 Inservice Insp Rept
ML17083C394
Person / Time
Site: Diablo Canyon 
Issue date: 01/22/1992
From: Rueger G
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML16341G426 List:
References
DCL-92-013, DCL-92-13, NUDOCS 9201310029
Download: ML17083C394 (8)


Text

ACCELERATED DISTRIBUTION DEMONS+ATION SYSTEM i

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9201310029 DOC.DATE: 92/01/22 NOTARIZED:

NO DOCKET FACIL:50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323

. AUTH.NAME AUTHOR AFFILIATION RUEGER,G.M.

Pacific Gas 6 Electric Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Diablo Canyon Unit 2 Inservice Insp Rept.

DISTRIBUTION CODE:

A047D COPIES RECEIVED:LTR t ENCL SIZE: f TITLE: OR Submittal: Inservice Inspection/Testing/Relief from ASME Cod NOTES:

D RECIPIENT ID CODE/NAME PD5 LA ROOD,H INTERNAL: ACRS NRR/DET EMEB 7E 0-f~

B REG FILE 01 EXTERNAL: EGGG BROWN, B NRC PDR COPIES LTTR ENCL 1

0 2

2 6

6 1

1 1

0 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD NRR/DET/ECMB 9H NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EGGG RANSOME,C NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

0 1

1 1

1 1

1 D

D R

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASI'E! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL 18 D

D S

+".i y

h Pacific Gas and Electric Company 77 Beate Street San Francisco, CA 94106 415/973-4684 Gregory M. Rueger Senior Vice President and General Manager Nuclear Power Generation January 22, 1992 PGSE Letter No. DCL-92-013 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Re:

Docket No. 50-323, OL-DPR-82 Diablo Canyon Unit 2 Fourth Refueling OUtage ISI 90-Day Report Gentlemen:

In accordance with ASNE Section XI, paragraph IWA-6220, enclosed is the Diablo Canyon Unit 2 Inservice Inspection (ISI) Report that provides results of Unit 2 fourth refueling outage inspections of Class 1 and 2

components and supports.

Sincerely, Grego N.

R cger Enclosure CC:

Ann P.

Hodgdon John B. Hartin (w/enc.)

Philip J. Horrill Harry Rood Cha'ries Tahnk, Hartford Steam Boiler (w/enc.)

Howard J.

Wong CPUC Diablo Distribution 5617S/85K/JHA/469 920131002'9 920122

',PDR

,ADOCK 05000323 PDR

~~

e.

K IF

. Distribution Sheet Distri-8.txt Priority: Normal From: Elaine Walker Action Recipients:

S Bloom E Peyton Internal Recipients:

RES/DET/MEB RES/DET/ERAB OGC/R E CENTER 01 CRS

, Copies:

1 Not Found 1

Not Found Not Found Not Found Not Found Not Found Not Found External Recipients:

NRC PDR NOAC LITCO ANDERSON Not Found Not Found 1

Not Found Total Copies:

10 Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993610027

Subject:

Inservice Inspection Relief Requests for Unit 2 Ninth Refueling Outage Weld Examinatio n Limitations Body:

PDR ADOCK 05000323 Q Docket: 05000323, Notes: N/A Page 1

ENCLOSURE DIABLO CANYON POWER PLANT UNIT 2 FOURTH REFUELING OUTAGE INSERVICE INSPECTION (ISI) REPORT

>920l3lPP29 S00012.ISI 1