DCL-91-142, Forwards Public Version of Rev 3,Change 11 to Emergency Plan

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 3,Change 11 to Emergency Plan
ML16341G120
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/28/1991
From: Womack L
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML16341G121 List:
References
DCL-91-142, NUDOCS 9106140163
Download: ML16341G120 (12)


Text

ACCELERATED DIS'AUBUTION DEMONSTPATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9106140163 DOC.DATE: 91/05/28 NOTARIZED: NO FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga AUTH.NAME AUTHOR AFFILIATION WOMACK,L. F-Pacific Gas,G Electr'ic Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Public version of Rev 3,Change 11 to "Emergency Plan."

DISTRIBUTION'ODE: DF01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Direct Flow Distribution: 50 Docket (PDR Avail)

NOTES:

DOCKET 05000275 05000323 R

RECIPIENT ID CODE/NAME INTERNAL: NUDOCS-ABSTRACT EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 1

1 REG FILE NSIC 01 RECIPIENT ID CODE/NAME COPIES LTTR ENCL 1

1 1

1 D

D R

D NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WARM CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 4

ENCL 4

Pacific Gas and Electric Company 77 Beate Street San Francisco, CA 94105 415/972-4758

'i.av,rance F Woman Manager Nuclear Operaticr s Suppo;t May 28, 1991 PG8E Letter No. DCL-91-142 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Re:

Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2

Emergency

Plan, Revision 3, Change ll Gentlemen:

In accordance with 10 CFR 50.4 and 10 CFR 50.54(q),

PGSE is submitting one copy of Revision 3, Change 11 to the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan (Enclosure 2).

Concurrently, two copies of this update are being submitted to the NRC, Region V office and one copy is being submitted to the NRC Resident Inspector.

This update contains privacy/proprietary information that is identified in Enclosure 1 and bracketed in accordance with NRC Generic Letter 81-27.

Sincerely, L. F.

Womack cc w/encs:

John B. Martin (2)

Paul P. Narbut cc w/enc cover pages:

Ann P.

Hodgdon Harry Rood Enclosures 5364S/0085K/ERK/179

(

9i06i40i63 910528 PDR ADOCK 05000275 F

PDR

l4

PG&E Letter No. DCL-91-142 ENCLOSURE 1

Location of Privac Pro rietar Information DCPP Unit 1 and 2

Emer enc Plan

~Pa es:

Section 6,

"Emergency Measures" Table 6. 1-2, "Assembly Areas Following Sounding of Site Emergency Signal" Section 7,

"Emergency Facilities and Equipment" Sub-Section 7.2 "Communications and Warning Systems" Page 1 of 4~

V Pages 7-19, 7-46, 7-47 Appendix H, "Procedures for Admission and Management of Radiation Casualties at French Hospital Medical Center, San Luis Obispo" Appendix I, "Federal Radiological Emergency

Response

Plan" Appendix K, "Radiological Emergency Mutual Assistance Agreement"

( Inter Utility) Agreement Appendix L, "Saint Francis Memorial Hospital Manual'n Admission and Management of Radiation Casualties" PG&E Letter to French Hospital 4 Medical Center Section 7,

"Procedures for Patient Decontaminatipn and Sample Taking,"

page 7-14 Appendix 8, "Telephone Numbers of Essential Personnel,"

pages B-l,~

8-2, 8-3, 8-4, and 8-5 NRC Letter To PG&E (ll/20/90)~

Exhibit 8, "Contact List,"~

page 1 of 1

Section 2, "Admission, Care and Treatment of Radiation Accident ~

Patients,"

page 2-2 Section 7, "Procedures of Patient Decontamination and Sample Taking,"

page 7-14 Section 8, "Telephone Numbers of Essential Personnel,"

February

1990, pages B-l, 8-2, 8-3, and 8-4 5364S/0085K

-A'ppendix H, "Institute of Nuclear Power Operation:

INPO's Role in an Emergency" INPO letters to PGEE (8/14/90 and 9/30/88),

INPO Emergency Resources Hanual (86-032),

page 1-2 INPO letter to PG&E (8/12/87)

INPO Emergency Resources Hanual (INPO 84-015) pages 1-1, 1-2, aod 1-3 Appendix N, "U.S. Coast Guard Procedure to be Followed Upon Notification of an Emergency at Diablo Canyon Power Plant" Appendix 0, "NRC Region V Incident

Response

Supplement" Cover Letter, Section 2104.6, "Communications,"

Items 1,

2, 3, and 4

NRC letter to PG&E (12/14/84) M 5364S/0085K

ti

PG&E Letter No. DCL-91-142 ENCLOSURE 2

DIABLO CANYON POWER PLANT UNITS 1

AND 2 EMERGENCY PLAN REVISION 3, CHANGE 1 1 5364S/0085K

\\

NUCLEAR REGULATORY COMMISSIONt WASHINGTON, D. C. 20555 June 12, 1991 50-275/323 Diablo Canyon MEMORANDUM FOR:

Chief, Document Control Branch, IRH FROM:

Director, Division of Freedom of Information and Publications

Services, ADM SUBECT:

REVIEW OF UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Freedom of Information and Publications Services has reviewed the attached document and has determined that it may now be made publicly available.

/7 Wl~~6~

Donnie M. Grimsley, Director Division of Freedom of Information and Publications Services Office of Administration