DCL-89-129, Forwards Application for Amends to Licenses DPR-80 & DPR-82, Consisting of License Amend Request 89-05,changing Tech Spec to Increase Diesel Generator Allowed Outage Time from 72 H to 7 Days

From kanterella
(Redirected from DCL-89-129)
Jump to navigation Jump to search
Forwards Application for Amends to Licenses DPR-80 & DPR-82, Consisting of License Amend Request 89-05,changing Tech Spec to Increase Diesel Generator Allowed Outage Time from 72 H to 7 Days
ML16342B559
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/12/1989
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML16341F149 List:
References
DCL-89-129, NUDOCS 8905170250
Download: ML16342B559 (4)


Text

ACCK1ZWTED Dl 1BUTt OY DEMONSTR ON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8905170250 DOC.DATE: 89/05/12 NOTARIZED: YES FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit, 1, Pacific Ga 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga AUTH.NAME AUTHOR AFFILIATION SHIFFER,J.D.

Pacific Gas 6 Electric Co.

RECIP.NAME" RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards application for amend to Licenses DPR-80 6 DPR-82, revising Tech Spec 3.8.1.1 tc increase DG AOT tc 7 days.

DISTRIBUTION CODE:

A001D COPIES RECEIVED LTR ENCL SIZE:

TITLE: OR Submittal:

General Distribution NOTES DOCKET I 05000275 05000323 RECIPIENT ID CODE/NAME PD5 LA ROOD,H INTERNAL: ACRS NRR/DEST/CEB 8H NRR/DEST/ICSB NRR/DEST/RSB 8E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1

1 5

5 6

6 1

1 1

1 1

1

,1 1

1 0

1 1

1 1

1 1

=

RECIPIENT ID CODE/NAME PD5 PD NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MTB 9H NRR/DOEA/TSB 1 1 OC B

REG FIL 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

" 1 1

1 1

1 1

0 1

1 1

1 R

I NOTE 'IO AZZ- 'RIDS RECZPIENIS.

PIZASE HELP US TO REDUCE KQ33E!

CXÃZACT 'IHE DOCUMEÃZ CDNIBOL DESKI RCCM Pl-37 (EXT. 20079)

KO ELZ?GRATE YOUR KAME FR% DISTRIBUTION LISTS FOR DOCUMENTS YOU DGNIT NEED)

TOTAL NUMBER OF COPIES REQUIRED:

LTTR '8 ENCL 26

~

rl

~ 4

Pacific Gas and Elactrfc Company May 12, 1989 PG&E Letter No. DCL-89-129 77 Beale Street San Francisco, CA 94106 415/972 7000 Tire 910 372.6587 James D. Shier Vice President Nuclear Power Generation U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Re: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1

and 2

License Amendment Request 89-05, Revision to Technical Specification 3.8.1, Electrical Power Systems, A.C. Sources Gentlemen:

Enclosed is an application for amendment to Facility Operating License Nos.

DPR-80 and DPR-82.

The enclosed License Amendment Request (LAR) proposes a revision to Technical Specification 3.8.1.1 that would increase the diesel generator (DG) allowed outage time (AOT) from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days.

PG&E has been implementing activities to enhance DG reliability at Diablo Canyon.

These activities consist of developing preventive mai ntenance procedures, providing personnel

training, and implementing industry,
NRC, and vendor DG reliability improvement recommendations.
Further, PG&E is planning to install a sixth DG by the fourth refueling outage of Unit 2 and has committed significant resources to this effort.

As part of this overall effort, PG&E also made evaluations to determine an acceptable AOT for its DG system based on risk and reliability considerations and the need for suffici ent time to perform maintenance and testi ng.

The AOT determination study was performed based upon availability, reliability, and risk considerations and was documented in a previous PG&E letter, DCL-89-126, dated May 11, 1989.

PG&E requests review of this LAR on a high priority basis and NRC approval by mid-September 1989 to ensure that sufficient planning can be accomplished to support the extensive diesel generator maintenance and testing required by the Technical Specifications during the next Unit 1

refueling outage.

Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

incerely,

. Shi r

cc:

J.

B. Martin M. M. Mendonca P.

P. Narbut H.

Rood B.

H. Vogler CPUC Diablo Distribution Enclosure

(

8905170250 S905l2 PDR ADOCK 05000275 2679S/0069K/GCW/2054 L.

P PDC

~ 4

~

f

~

1