DCL-84-189, Forwards Public Version of Emergency Implementing Procedures,Including Rev 6 to EP OP-0, Reactor Trip W/ Safety Injection & Rev 4 to EP G-2, Establishment of Onsite Emergency Organization. W/Jm Felton 850625 Memo
| ML16341C177 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/21/1984 |
| From: | Schuyler J PACIFIC GAS & ELECTRIC CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML16341C179 | List: |
| References | |
| DCL-84-189, GL-81-27, NUDOCS 8406290127 | |
| Download: ML16341C177 (2) | |
Text
0 i
M.CIP IC GA.S AND ZLZC TRIC C 01'A,KY
~
77 BEALE STREET, SAN FRANCISCO, CALIFORNIA 94106 TELEPHONE (415> 781.42II IF(2 ~LE May 21, 1984 PGandE Letter No.:
DCL-84-189 Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission, Region V
1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re:
Docket No. 50-275, OL-DPR-76 Docket No. 50-323 Diablo Canyon Units 1 and 2
Emergency Plan Implementing Procedures Updates Deat Mre Martin:
In accordance with Section V, "Implementing Procedures,"
of 10 CFR 50, Appendix E, PGandE is submitting one copy of the updates to the detailed Implementing Procedures for the Diablo Canyon Power Plant Units 1 and 2
Emergency Plan as listed in Attachment 1.
Concurrently, two copies of each update are being submitted to the Document Control Desk.
Some of the updates contain privacy/proprietary information.
This privacy/proprietrary information has been bracketed in accordance with NRC Generic Letter 81-27 and is identified in Attachment 2.
Kindly acknowledge receipt of the above material on the enclosed copy of this letter and return it in the enclosed addressed envelcpe.
Sincerely, ORlGIHAI Sl6HED SY J. 0. Schuyler Enclosures Attachments cc w/enc:
R. Fish Document Control Desk (2)~
Service List cc w/att - w/o enc:
G.
W. Knighton oo<
8~06290l27 840625 PDR ADOCK 05000275 PDR
, ~
~
~