DCL-20-106, Nuclear Material Transaction Report for New Fuel

From kanterella
Jump to navigation Jump to search
Nuclear Material Transaction Report for New Fuel
ML20359A013
Person / Time
Site: Diablo Canyon  
Issue date: 12/24/2020
From: Gerfen P
Pacific Gas & Electric Co
To: Cettin J
Document Control Desk, Office of Nuclear Reactor Regulation, US Dept of Energy (DOE)
References
DCL-20-106
Download: ML20359A013 (2)


Text

Paula Gerfen Site Vice President Diablo Canyon Power Plant Mail code 104/6/605 P.O. Box 56 Avila Beach, CA 93424 805.545.4596 Internal: 691.4596 Fax: 805.545.4234 A member of th e STARS Allian ce Callaway

  • Diablo Can yon
  • Palo Verde
  • Wolf Creek December 24, 2020 PG&E Letter DCL-20-106 John Cettin, 10 CFR 74.15 NMMSS Program, NA-532, Germantown Building U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-1290 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Nuclear Material Transaction Report for New Fuel

Dear Mr. Cettin:

Pursuant to 10 CFR 74.15, the enclosure provides three files in a computer-readable format of the Nuclear Material Transaction Reports for materials received on December 14, 2020, December 15, 2020, and December 16, 2020. The files were prepared in accordance with NUREG/BR-0006, Revision 9, Instructions for Completing Nuclear Material Transaction Reports, dated August 2020, and Nuclear Materials Management and Safeguards System (NMMSS) Report D-24, Personal Computer Data Input for Nuclear Regulatory Commission Licensees, dated August 2016.

Pacific Gas and Electric Company makes no new or revised regulatory commitments (as defined by NEI 99-04) in this report.

If you have any questions regarding the enclosure, please contact Mr. Gregory V.

Johnson at (805) 545-4376.

Sincerely, Paula Gerfen Pacific Gas and Electric Company*

Mr. John Cettin PG&E Letter DCL-20-106 December 24, 2020 Page 2 A m em ber of t he STARS Alli ance Callaway

  • D i ablo Canyon
  • Palo Ver de
  • Wolf Cr eek Enclosure cc: Donald R. Krause, NRC Senior Resident Inspector Samson S. Lee, NRC Project Manager Scott A. Morris, NRC Region IV Administrator NRC Document Control Desk Diablo Distribution