DCL-18-041, ISFSI - Transmittal of Emergency Plan and Emergency Plan Implementing Procedure Update
| ML18143B481 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/17/2018 |
| From: | Ginn M Pacific Gas & Electric Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18143B459 | List: |
| References | |
| DCL-18-041, DIL-18-007 | |
| Download: ML18143B481 (3) | |
Text
Pacific Gas and Electric Company"'
May 17, 2018 PG&E Letter DCL-18-041 PG&E Letter DIL-18-007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Docket No. 72-26, Materials License No. SNM-2511 Diablo Canyon Independent Spent Fuel Storage Installation Michael A. Ginn Manager Emergency Planning 10 CFR 50.54(q) 10 CFR 72.32 10 CFR 72.44(f)
Emergency Plan and Emergency Plan Implementing Procedure Update
Dear Commissioners and Staff:
In accordance with the requirements of10 CFR 50.54(q)(5), 10 CFR 72.32, and Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 805.545.6300 Internal: 691.6300 Fax: 805.545.6265 10 CFR 72.44(f), Pacific Gas and Electric Company (PG&E) is providing a summary of the analysis of changes to the ~mergency Plan (E-Plan) and Emergency Plan Implementing Procedures within the associated enclosures listed below:
- - Diablo Canyon Power Plant Emergency Plan and Emergency
. Plan Implementing Procedures, Emergency Plan Table of Contents, Revision Numbers for Emergency Plan Implementing Procedures
- - Summary of the Analysis of Changes in Emergency Plan Section 6, Revision 4.18, "Emergency Measures"
- - Summary of the Analysis of Changes in Emergency Plan Section 7, Revision 4.21, "Emergency Facilities and Equipment"
- - Summary of the Analysis of Changes in Emergency Plan Implementing Procedure EP RB-9, Revision 16, "Calculation of Release Rate"
. f!i4S A member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek tJfll/55 z~
jll/lC
/l);v/55
Document Control Desk May 17, 2018 Page2 PG&E Letter DCL-18-041 PG&E Letter DIL-18-007
- - Summary of the Analysis of Changes in Emergency Plan Implementing Procedure EP RB-10, Revision 20, "Protective Action Recommendations"
- - Summary_of the Analysis of Changes in Emergency Plan Implementing Procedure EP RB-11, Revision 15,- "Emergency Offsite Dose Calculations"
- - Summary of the Analysis of Changes in Emergency Plan
_ Implementing Procedure EP RB-12, Revision 12, "Plant Vent Iodine and Particulate Sampling During Accident Conditions"
- - Summary of the Analysis of Changes in Emergency Plan Implementing Procedure EP RB-14, Revision 10, "Core Damage Assessment Procedure"
- - Summary of the Analysis of Changes in Emergency Plari Implementing Procedure EP RB-16, Revision 15, "Operating Instructions for the EARS Computer Program"
- O - Summary of the Analysis of Changes in Emergency Plan Implementing Procedure EP R~-17, Revision 0, "Operation Instructions for QuickDose"
- 1 - Summary of the Analysis of Changes in Emergency Plan Implementing Procedure EP R-2, Revision 35, "Release of Airborne Radioactive Materials Initial Assessment"
- 2 - Summary of the Analysis of Changes in Emergency Plan Implementing Procedure EP EF-1, Revision 54, "Activation and Operation of the Technical Support Center"
- 3 - Summary of the Analysis of Changes in Emergency Plan Implementing Procedure EP EF-3, Revision 45, "Activation and Operation of the Emergency Operations Facility" PG&E evaluated the changes for a reduction in effectiveness, as defined in 10 CFR 50.54(q), and concluded that the changes do not reduce the effectiveness of the E-Plan. The E-Plan continues to meet the requirements in Appendix E to 10 CFR Part 50 and the planning standards of 10 CFR 50.47(b). Therefore, PG&E concluded that prior NRC approval of the associated changes was not required.
A member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde-* Wolf Creek
Document Control Desk May 17, 2018 Page 3 PG&E Letter DCL-18-041 PG&E Letter DIL-18-007 This update does not contain any privacy or proprietary information in accordance with NRC Generic Letter 81-27, "Privacy and Proprietary Material in Emergency Plans."
PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.
If there are questions regarding this update, please contact me at (805) 545-3446.
Sincerely,
~_iL~ G Michael A. Girin Manager, Emergency Planning mem6/4539/50977001 Enclosures cc/enc: William C. Allen, P.E., NMSS Project Manager Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRC Senior Project Manager Senior Emergency Preparedness Inspector (RGN-IV/DR)
A member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek