DCL-18-004, Submittal of Errata for the Mitigating Strategies Assessment (MSA) for Flooding Report
| ML18032A762 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/01/2018 |
| From: | Welsch J Pacific Gas & Electric Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| DCL-18-004, EA-12-049 | |
| Download: ML18032A762 (2) | |
Text
~ cific Gas and Electric Company February 1, 2018 PG&E Letter DCL-18-004 James M. Welsch Vice President Nuclear Generation and Chief Nuclear Officer Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 805.545.3242 E*Mail: JMWl@pge.com U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 EA-12-049 10 CFR 50.54(f)
Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Errata for the Diablo Canyon Power Plant Mitigating Strategies Assessment (MSA) for Flooding Report
References:
- 1. PG&E Letter to NRC, DCL-17-024, "Submittal of the Diablo Canyon Power Plant Mitigating Strategies Assessment for Flooding Report," April 6, 2017
Dear Commissioners and Staff:
Pacific Gas and Electric Company (PG&E) submitted the MSA for Flooding Report to the NRC in April2017 (Reference 1). During subsequent reviews of this submittal, it was discovered that Table 1 of the report referenced an incorrect elevation datum. As previously discussed with your staff, the following changes were made to correct the table:
- Th-e datum referenced in the second column of Table 1 entitled "Stillwater Elevation and Reevaluated Hazard Elevation (ft NAVD88)" was incorrectly shown as "(ft NAVD88);" whereas, the values shown in the table are calculated based on "(local PG&E datum)." To correct this error, the column datum was changed from (ft NAVD88) to (ft local PG&E datum).
The relationship between "local PG&E datum" and "NAVD88 datum" was clarified within Note 3 of the table to state that 0.687 feet should be added to the "local PG&E datum" to convert these values to "NAVD88 datum."
- The first entry in column 2 for Door A 1.1 was changed from 87.48 (ft NAVD88) to 86.79 (ft local PG&E datum) to be consistent with the datum clarification.
No other changes were made in Table 1 of the MSA for Flooding Report. Further, the evaluations and conclusions provided in Reference 1 remain unchanged.
A member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek
Document Control Desk February 1, 2018 Page2 PG&E Letter DCL-18-004 PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.
If you have any questions or require additional information, please contact Mr. Hossein Hamzehee at 805-545-4720.
I state under penalty of perjury that the foregoing is true and correct.
Executed on February 1, 2018.
Sincerely,
&:~
Vice President Nuclear Generation and Chief Nuclear Officer mem6/4539/50465780 cc:
Diablo Distribution Brian E. Holian, Acting NRC/NRR Director Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Joseph M. Sebrosky, NRC Project Manager Balwant K. Singal, NRR Senior Project Manager A
member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek