DCL-18-004, Submittal of Errata for the Mitigating Strategies Assessment (MSA) for Flooding Report

From kanterella
(Redirected from DCL-18-004)
Jump to navigation Jump to search
Submittal of Errata for the Mitigating Strategies Assessment (MSA) for Flooding Report
ML18032A762
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/01/2018
From: Welsch J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-18-004, EA-12-049
Download: ML18032A762 (2)


Text

~ cific Gas and Electric Company February 1, 2018 PG&E Letter DCL-18-004 James M. Welsch Vice President Nuclear Generation and Chief Nuclear Officer Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 805.545.3242 E*Mail: JMWl@pge.com U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 EA-12-049 10 CFR 50.54(f)

Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Errata for the Diablo Canyon Power Plant Mitigating Strategies Assessment (MSA) for Flooding Report

References:

1. PG&E Letter to NRC, DCL-17-024, "Submittal of the Diablo Canyon Power Plant Mitigating Strategies Assessment for Flooding Report," April 6, 2017

Dear Commissioners and Staff:

Pacific Gas and Electric Company (PG&E) submitted the MSA for Flooding Report to the NRC in April2017 (Reference 1). During subsequent reviews of this submittal, it was discovered that Table 1 of the report referenced an incorrect elevation datum. As previously discussed with your staff, the following changes were made to correct the table:

  • Th-e datum referenced in the second column of Table 1 entitled "Stillwater Elevation and Reevaluated Hazard Elevation (ft NAVD88)" was incorrectly shown as "(ft NAVD88);" whereas, the values shown in the table are calculated based on "(local PG&E datum)." To correct this error, the column datum was changed from (ft NAVD88) to (ft local PG&E datum).

The relationship between "local PG&E datum" and "NAVD88 datum" was clarified within Note 3 of the table to state that 0.687 feet should be added to the "local PG&E datum" to convert these values to "NAVD88 datum."

  • The first entry in column 2 for Door A 1.1 was changed from 87.48 (ft NAVD88) to 86.79 (ft local PG&E datum) to be consistent with the datum clarification.

No other changes were made in Table 1 of the MSA for Flooding Report. Further, the evaluations and conclusions provided in Reference 1 remain unchanged.

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Document Control Desk February 1, 2018 Page2 PG&E Letter DCL-18-004 PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions or require additional information, please contact Mr. Hossein Hamzehee at 805-545-4720.

I state under penalty of perjury that the foregoing is true and correct.

Executed on February 1, 2018.

Sincerely,

&:~

Vice President Nuclear Generation and Chief Nuclear Officer mem6/4539/50465780 cc:

Diablo Distribution Brian E. Holian, Acting NRC/NRR Director Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Joseph M. Sebrosky, NRC Project Manager Balwant K. Singal, NRR Senior Project Manager A

member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek