DCL-17-027, 3 of the Physical Security Plan

From kanterella
Jump to navigation Jump to search
3 of the Physical Security Plan
ML17114A074
Person / Time
Site: Diablo Canyon  
Issue date: 04/12/2017
From: Welsch J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
DCL-17-027, DIL-17-005
Download: ML17114A074 (4)


Text

c**

(

SAIFEGUARDS INf'ORl\\.aATmN ENCLOSURE 1 TO THIS LETTER IS SAFEGUARDS INFORMATION.

lf5l

  • ir*

if".

n11 ENCLOSURE 2 TO THIS LETTER IS SAFEGUARDS INFORMATION.

r(JJCDu~C 1JJJB1S Bll!!ltu1

!Effecffrfftr; C@m(pf!ll!!lJ/

_James M. Welsch Vice President, Nuclear Generation April 12, 2017 PG&E Letter DCL-17-027 PG&E Letter DI L-17 -005

. Diablo Canyon Power Plant Mail Code 104/6 P. D. Box 56 Avila Beach, CA 93424 805. 545. 3242 Internal: 691. 3242 Fax: 805. 545.4884 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(p), 10 CFR 72.44 Docket No. 50-275, OL-DPR-80 DoC,ket No.. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Materials License No. SNM-2511, Docket No. 72-26 Diablo Canyon Independent Spent Fuel Storage Installation Revision 13 of the Physical Security Plan

Dear Commissioners and Staff:

As required by 10 CFR 50.54(p) and 10 CFR 72.44(e), Pacific Gas and Electric Company (PG&E) hereby submits Revision 13 of the Diablo Canyon Power Plant (DCPP) Physical Security Plan (PSP), with the following appendices:

"Appendix A: Glossary of Terms and Acronyms "Appendix B: Training and Qualification Plan

.. Appendix D: Independent Spent Fuel Storage Installation (ISFSI) Security Program PG&E determined that the changes made to the PSP and appendices do 'not decrease safeguards effectiveness of the PSP. contains a Table of Changes to DCPP's PSP and appendices, 10 CFR 50.54(p) evaluations and supporting documentation. Enclosure 1 contains Safeguards Information, which shall be withheld from public disclosure under 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements." is Revision 13 of DCPP's PSP with appendices. Enclosure 2 contains Safeguards Information, which shall be withheld from public disclosure under 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements."

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek SAFEGUARDS INFORMATION ENCLOSURE 1 TO THIS LETTER IS SAFEGUARDS INFORll(lATION.

ENCLOSURE 2 TO THIS LETTER IS SAFEGUARDS INFORMATION.

WHEN SEPARATED FROM THE ENCLOSURES, THIS DOCUMENT IS DECONTROLLED.

Sool

/fJ /fV1 5* s 1-~

rJf_JL rJM SS

c**

(

(

SAFEGUARDS INFORfi'illAT!ON ENCLOSURE 1 TO THIS LETTER IS SAFEGUARDS INFORMATION.

ENCLOSURE 2 TO THIS LETTER IS SAFEGUARDS INFORMATION.

Document Control Desk PG&E Letter DCL-17-027 April 12, 2017 PG&E.Letter DIL-17-005 Page2 PG&E makes no new or revised regulatory commitments (as denned by NEI 99-04) in this letter.

Should you require further information, please contact Mr. Doug Evans, Oirector of Nuclear Security and Emergency Services at (805) 545-3877.

Sincerely, c;l;:~

Vice President, Nuclear Generation bnsm/4540 Enclosures cc:

John M. Goshen, P.E., NMSS Project Manager Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRC Senior Project Man?ger cc/enc:

Kriss M. Kennedy, NRC Region IV Administrator (2)

A member of the STARS Alliance Callaway

  • Dia!;>lo Canyon
  • Palo Verde
  • Wolf Creek SAFEGUARDS INFORMATION ENCLOSURE 1 TO THIS LETTER IS SAFEGUARDS INFORMATION.

ENCLOSURE 2 TO THIS LETTER IS SAFEGUARDS INFORMATION.

WHEN SEPARATED FROM THE ENCLOSURES, THIS DOCUMENT IS DECONTROLLED.

(

SAFEGUARDS INFORMATION THIS ENCLOSURE CONTAINS SAFEGUARDS INFORMATION.

Physical Security Plan Table of Changes and PG&E Letter DCL-17-027 PG&E Letter DIL-17-005 10 CFR 50.54(p) Evaluations and Supporting Documentation SAFEGUARDS INFORMATION THIS ENCLOSURE CONTAINS SAFEGUARDS INFORMATION.

WHEN SEPARATED FROM THE ENCLOSURE, THIS COVER PAGE IS DECONTROLLED.

SAFEGUARDS !NFOROOAT~ON THIS ENCLOSURE CONTA!NS SAFEGUARDS INFORMATION.

PG&E Letter DCL-17-027 PG&E Letter DIL-17-005 Diablo Canyon Power Plant

  • Physical Security Plan, Revision 13 ang Appendices A, B, C, and D SAFEGUARDS INFORMATiOf\\!

THIS ENCLOSURE CONTAINS SAFEGUARDS INFORMATION.

WHEN.SEPARATED FROM THE ENCLOSURE, THIS COVER PAGE IS DECONTROLLED.