120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima
ML12192A093
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/09/2012
From: Becker J
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
DCL-12-066
Download: ML12192A093 (3)


Text

Pacific Gas and Electric Company July 9,2012 PG&E Letter DCL-12-066 u.s. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 James R. Becker Site Vice President Diablo Canyon Power Plant Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 805.545.3462 Internal: 691.3462 Fax: 805.545.6445 10 CFR 50.54(f)

Pacific Gas and Electric Company's 120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident

References:

1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, dated March 12, 2012
2. NRC Letter, Endorsement of Electric Power Research Institute (EPRI) Draft Report 1025286, "Seismic Walkdown Guidance," dated May 31,2012

Dear Commissioners and Staff:

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to Pacific Gas and Electric Company (PG&E). Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic. This letter provides PG&E's 120-day response to Reference 1 for Seismic Recommendation 2.3 for Diablo Canyon Power Plant (DCPP).

For Seismic Recommendation 2.3 (walkdowns), Enclosure 3 of Reference 1 states that each licensee will confirm that they intend to use the NRC-endorsed seismic walkdown procedure or provide to the NRC a description of the process that will be used to conduct the walkdowns and develop the needed information.

PG&E confirms that it will use the seismic walkdown guidance (EPRI 1025286, "Seismic Walkdown Guidance: For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic") as endorsed by Reference 2 A

member of the STARS (Strategic Teaming and Resource Sharing)

Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • San Onof r e
  • Wolf Creek

m Document Control Desk July 9,2012 I & Page 2 PG&E Letter DCL-12-066 to conduct the walkdowns and develop the needed information at DCPP.

PG&E is making regulatory commitments (as defined by NEI 99-04) in the Enclosure of this letter. This letter includes no revisions to existing regulatory commitments.

If you have any questions, or require additional information, please contact Mr. Jearl Strickland at (805) 781-9785 I declare under penalty of perjury that the foregoing is true and correct.

Executed on July 9, 2012.

Site Vice President ckf6/SAPN 50465913-10 Enclosure cc:

Diablo Distribution

  • cc:/enc: Elmo E. Collins, NRC Region IV Eric J. Leeds, NRC Director, Office of Nuclear Reactor Regulation Michael S. Peck, NRC, Senior Resident Inspector Joseph M. Sebrosky, NRR Project Manager A

member of the STARS (Strategic Teaming and Resource Sharing)

Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • San Onofre
  • Wolf Creek

Regulatory Commitments Enclosure PG&E Letter DCL-12-066 Page 1 of 1 PG&E is making the following regulatory commitments (as defined by NEI 99-04) in this submittal:

Commitment Due Date PG&E confirms that it will use the seismic walkdown November 27,2012 guidance (EPRI 1025286, "Seismic Walkdown Guidance: For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic") as endorsed by Reference 2 to conduct the walkdowns and develop the needed information at DCPP.