DCL-12-022, Correction to Licensing Basis Verification Project Letter Number
| ML12058A075 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/24/2012 |
| From: | Becker J Pacific Gas & Electric Co |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| DCL-12-022 | |
| Download: ML12058A075 (2) | |
Text
Pacific Gas and Electric Company February 24,2012 PG&E Letter No. DCL-12-022 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 James R. Becker Site Vice President Diablo Canyon Power Plant Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 805.545.3462 Internal: 691.3462 Fax: 805.545.6445 Correction to Diablo Canyon Power Plant Licensing Basis Verification Project Letter Number
Reference:
- 1. PG&E Letter DCL-12-003, "Diablo Canyon Licensing Basis Verification Project," dated January 5, 2012, (Adams Accession Number ML120060165)
Dear Commissioners and Staff:
By letter dated January 5, 2012, (Reference 1), Pacific Gas and Electric Company (PG&E) extended and clarified the completion date of the Licensing Basis Verification Project. After submitting the letter, an incorrect letter number was identified on page 2 of the submittal. This letter is to clarify that on page 2 of PG&E Letter DCL-12-003 (Reference 1) the letter number in the upper right hand corner which reads "DCL-11-140" should be consistent with page 1 and read "DCL-12-003".
PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter.
Questions concerning this letter should be directed to Mr. Eric P. Nelson at (805) 545-4777.
A member of the STARS (StrategiC Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project
- Wolf Creek
I~
Document Control Desk February 24,2012 I & Page 2 EPN/50455578 cc:
Elmo C. Collins, NRC Region IV PG&E Letter DCL-12-022 Ronald A. Kopriva, NRC Senior Reactor Inspector, Region IV Eric P. Nelson, PG&E Michael S. Peck, NRC Senior Resident Inspector Joseph M. Sebrosky, NRR Project Manager Alan B. Wang, NRR Project Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project
- Wolf Creek