MONTHYEARDCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-20-021, Submittal of 2020 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant and Humboldt Bay Power Plant2020-04-0101 April 2020 Submittal of 2020 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant and Humboldt Bay Power Plant DCL-19-024, And Humboldt Bay Power Plant 2019 Annual Statement of Insurance2019-03-28028 March 2019 And Humboldt Bay Power Plant 2019 Annual Statement of Insurance ML16154A1652016-04-27027 April 2016 Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report L-2016-518, Diablo Canyon Power Plant, Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report2016-04-27027 April 2016 Diablo Canyon Power Plant, Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report DCL-16-052, Submittal of Annual Report of Occupational Radiation Exposure for 20152016-04-26026 April 2016 Submittal of Annual Report of Occupational Radiation Exposure for 2015 DCL-15-093, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20142015-08-0606 August 2015 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2014 DCL-2014-517, Letter from Kenneth W. Cortese Report on Discharge Monitoring at Diablo Canyon Power Plant2014-04-17017 April 2014 Letter from Kenneth W. Cortese Report on Discharge Monitoring at Diablo Canyon Power Plant DCL-14-025, Annual Report of Occupational Radiation Exposure for 20132014-04-10010 April 2014 Annual Report of Occupational Radiation Exposure for 2013 ML14087A1242014-02-28028 February 2014 Annual Report on Discharge Monitoring DCL-2014-509, Annual Report on Discharge Monitoring2014-02-28028 February 2014 Annual Report on Discharge Monitoring DCL-07-047, Annual Radioactive Effluent Release Report2007-04-27027 April 2007 Annual Radioactive Effluent Release Report DCL-06-088, CFR 50.46 Annual Report for 2005 of Emergency Core Cooling System Evaluation Model Changes2006-07-24024 July 2006 CFR 50.46 Annual Report for 2005 of Emergency Core Cooling System Evaluation Model Changes DCL-2006-522, PG&E Diablo Canyon Power Plant (DCPP) Submittal - Receiving Water Monitoring Program 2005 Annual Report2006-04-28028 April 2006 PG&E Diablo Canyon Power Plant (DCPP) Submittal - Receiving Water Monitoring Program 2005 Annual Report DCL-06-048, 2005 Annual Radioactive Effluent Release Report2005-12-31031 December 2005 2005 Annual Radioactive Effluent Release Report DCL-05-050, 2004 Annual Radiological Environmental Operating Report2005-04-29029 April 2005 2004 Annual Radiological Environmental Operating Report DCL-05-027, PG&E Corporation 2004 Annual Report2005-03-22022 March 2005 PG&E Corporation 2004 Annual Report DCL-04-051, Units I and 2, 2003 Annual Radiological Environmental Operating Report2004-04-30030 April 2004 Units I and 2, 2003 Annual Radiological Environmental Operating Report DCL-04-053, Annual Nonradiological Environmental Operating Report2004-04-28028 April 2004 Annual Nonradiological Environmental Operating Report DCL-04-038, Annual Technical Specification 5.6.1 Report2004-04-16016 April 2004 Annual Technical Specification 5.6.1 Report DCL-03-040, Annual Technical Specification 5.6.1 Report2003-04-16016 April 2003 Annual Technical Specification 5.6.1 Report DCL-02-114, Commitment Change Summary Report, January - December 20012002-09-24024 September 2002 Commitment Change Summary Report, January - December 2001 DCL-02-089, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes2002-07-26026 July 2002 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes 2024-03-27
[Table view] Category:Letter type:DCL
MONTHYEARDCL-24-120, Nuclear Material Transaction Report for New Fuel2024-12-18018 December 2024 Nuclear Material Transaction Report for New Fuel DCL-24-116, Draft Supplemental Environmental Impact Statement Comment Letter2024-12-13013 December 2024 Draft Supplemental Environmental Impact Statement Comment Letter DCL-24-094, License Amendment Request 24-04 Application to Revise Technical Specifications (TS) to Adopt TSTF-589 to Modify TS 3.3.5 and 3.8.22024-11-20020 November 2024 License Amendment Request 24-04 Application to Revise Technical Specifications (TS) to Adopt TSTF-589 to Modify TS 3.3.5 and 3.8.2 DCL-24-106, Technical Specification Bases, Revision 152024-11-18018 November 2024 Technical Specification Bases, Revision 15 DCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-2024-535, Rd Quarter 2024 Discharge Self-Monitoring2024-10-17017 October 2024 Rd Quarter 2024 Discharge Self-Monitoring DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update 2024-09-09
[Table view] |
Text
.1 P Pacifc Gas and Electric Company James RI Becker Vice President-Diablo Canyon Operations and Station Director Diablo Canyon Power Plant PO. Box 56 Avila Beach, CA 93424 April 16, 2004 805.545.3462 Fax: 805.545.4234 PG&E Letter DCL-04-038 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 2003 Annual Technical Specification 5.6.1 Report
Dear Commissioners and Staff:
In accordance with Technical Specification (TS) 5.6.1, "Annual Reports,"
Pacific Gas & Electric Company is submitting the annual tabulation of exposure to radiation for Diablo Canyon Power Plant Units, I and 2, for 2003.
TS 5.6.1 requires an annual report that includes a tabulation of the number of station, utility, and other personnel receiving exposure greater than 100 millirem per year, and their associated exposure according to work and job function. The information is provided in accordance with the standard format of Regulatory Guide 1.16.
snf/4509/R0246451 Enclosure cc: Bruce S. Mallett David L. Prouix Girija S. Shukla Diablo Distribution 7 ~6' A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Caltaway
Pacific Gas and Electric Company Enclosure Diablo Canyon Power Plant PG&E Letter DCL 04-038 Units 1 and 2 Standard Format for Reporting Number of Personnel and Man-Rem by Work and Job Function Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2 Annual Tabulation of Exposure to Radiation for 2003
Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2 PG&E Letter DCL 04-038 Date: April 16, 2004 Regulatory Guide 1.16 Report for Year: 2003 Standard Format for Reporting Number of Personnel and Man-Rem by Work and Job Function NUMBER OF PERSONNEL*
(>100 MREM)
TOTAL MAN-REM WORK AND JOB FUNCTION Station Utility Contract Workers Station Utility Contract Workers (PERSONNEL GROUPING)
Employees Employees
& Others Employees Employees
& Others Reactor Operations
& Survelllance Maintenance 0
0 1
0.000 0.000 0.006 Operating 11 0
0 0.309 0.000 0.000 Health Physics 0
0 0
0.000 0.000 0.000 Supervisory 0
0 0
0.000 0.000 0.000 Engineering 2
0 0
0.064 0.000 0.000 Routine Maintenance Maintenance 67 2
108 2.260 0.052 2.392 Operating 18 1
1 0.129 0.009 0.008 Health Physics 22 0
8 0.848 0.000 0.300 Supervisory 1
0 0
0.003 0.000 0.000 Engineering 17 1
1 0.334 0.015 0.001 Inservice Inspection Maintenance 4
0 16 0.239 0.000 1.219 Operating 2
0 0
0.249 0.000 0.000 Health Physics 0
0 0
0.000 0.000 0.000 Supervisory 0
0 0
0.000 0.000 0.000 Engineering 7
1 0
0.916 0.085 0.000 Special Maintenance Maintenance 27 1
2 3.050 0.001 0.185 Operating 0
0 0
0.000 0.000 0.000 Health Physics 10 0
0 0.311 0.000 0.000 Supervisory 0
0 0
0.000 0.000 0.000 Engineering 4
0 0
0.134 0.000 0.000 1
Pacific Gas and Electric Company Diablo Canyon Power Plant Units I and 2 PG&E Letter DCL 04-038 Date: April 16, 2004 Regulatory Guide 1.16 Report for Year: 2003 Standard Format for Reporting Number of Personnel and Man-Rem by Work and lob Function NUMBER OF PERSONNEL*
(>100 MREM)
TOTAL MAN-REM WORK AND JOB FUNCTION Station Utility Contract Workers Station Utility Contract Workers (PERSONNEL GROUPING)
Employees Employees
& Others Employees Employees
& Others Waste Processing Maintenance 9
0 5
0.065 0.000 0.011 Operating 0
0 0
0.000 0.000 0.000 Health Physics 11 0
1 1.663 0.000 0.160 Supervisory 0
0 0
0.000 0.000 0.000 Engineering 0
0 0
0.000 0.000 0.000 Refueling Maintenance 73 4
254 17.783 0.650 65.328 Operating 22 1
1 3.963 0.176 0.130 Health Physics 23 0
13 5.059 0.000 2.843 Supervisory 1
0 0
0.387 0.000 0.000 Engineering 22 1
3 4.345 0.001 0.618 Total Maintenance 180 7
386 23.397 0.703 69.141 Operating 53 2
2 4.650 0.185 0.138 Health Physics 66 0
22 7.881 0.000 3.303 Supervisory 2
0 0
0.390 0.000 0.000 Engineering 52 3
4 5.793 0.101 0.619 Grand Total 353 12 414 42.111 0.989 73.201 The "Number of Personnel" listed in the upper section of the table, are the number of personnel in the department receiving > 100 mRem. However, their entire dose was not necessarily received on a single Job Function. The personnel may have received their dose from multiple Job Functions. Therefore, depending on how many jobs contributed to their dose, the same person may be counted multiple times in the lower "totals" section of the table.
2